Another community hydro - Lochaber

Water turbines and anything associated
Post Reply
AE-NMidlands
Posts: 2024
Joined: Wed Jun 02, 2021 6:10 pm

Another community hydro - Lochaber

#1

Post by AE-NMidlands »

I have just had an email advertising it:


Dear Supporter,

We are delighted to announce that the LEG Power Lochaber share offer is now live and we thought this may be of interest to you. We are pleased to announce that we are now issuing the share offer to raise £1,880,000 for the construction of a 100% community owned 547kW hydro scheme located in Glehachulish in Scotland.

Energy4All are supporting this society with their share offer.

The closing date for this offer is 30 September 2021. .

Highlights of the offer:

The offer is seeking to raise a maximum of £1,880,000
Minimum investment £100
Maximum investment £50,000
Share interest on investment starts at 4% and equity returned over 20 years
Surplus profits for community benefit

Click the links below for full details of the scheme, the share offer and how to invest.

Download Share Offer Document including Terms & Conditions
Online Application Form
Link to LEG Power Website
Let's hope it is running in time to get the FITs - Sept 2022 is the cut-off and they say
The contractor has confirmed that it has the capacity available to complete construction
of the Project within the Feed-in Tariff (‘FiT’) deadline. Nevertheless, if there is a material delay in construction or the
delivery of the turbine (which is being shipped from the Czech Republic and due to be delivered in April 2022), resulting
in commissioning of the Project occurring after 30 September 2022, the Project will not qualify for the FIT which
constitutes rather more than half of its projected income.
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 8083
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Another community hydro - Lochaber

#2

Post by Joeboy »

Makes it a whole other thing if they can't get the FIT. I'll pass on this one sadly. :(
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
GarethC
Posts: 209
Joined: Mon May 31, 2021 8:32 pm

Re: Another community hydro - Lochaber

#3

Post by GarethC »

It's Glenachulish. Always unfortunate to manage a typo in the first paragraph. I'll go an check it out next time I visit my folks. I was running up there last week, and have a fair idea where it must be going even before reading the docs (which I'll do now)
SporranMcDonald
Posts: 52
Joined: Thu Feb 16, 2023 10:29 am
Location: East Hampshire

Re: Another community hydro - Lochaber

#4

Post by SporranMcDonald »

A quick update on this project - of which I am a co-operative member.

It did get up-and-running ( Autumn 2022 ), just in time to qualify for the ongoing FIT payments.

General performance : as projected, with a few months over and a few under during the year.

Some bad news : 18th Sep 2023 - a sound baffle on a manhole/inspection cover fell down into the main flow pipe - which flooded the powerhouse around 1 metre deep. Ongoing efforts to repair and get back into action - with Loss Adjusters and Insurers.

Good news : Income stream is covered by Business Interruption Insurance.

Fingers-crossed for a speedy return to full power.
4 kWp Solar PV : 50%/50% SE/SW : Solis Hybrid 3.6 : Pylontec 9.6 kWh
5 kW & 4kW Air-to-Air Mitsubishi Heat Pumps
Ripple : Graig Fatha & Kirk Hill . . . . plus various other renewable projects.
No Car : bicycles : bus & train
GarethC
Posts: 209
Joined: Mon May 31, 2021 8:32 pm

Re: Another community hydro - Lochaber

#5

Post by GarethC »

Great that it's up and running. Will go for a nosey next time I'm in Ballachulish. Hope gets fixed soon. Thanks for the update.
SporranMcDonald
Posts: 52
Joined: Thu Feb 16, 2023 10:29 am
Location: East Hampshire

Re: Another community hydro - Lochaber

#6

Post by SporranMcDonald »

UPDATE by email : 23rd Jan 2024
Dear Member

Flood damage to the generation system

The Board is pleased to bring you an update on the repair work of the generator system and powerhouse following the flood event. Much has been happening since the breakdown in September 2023 and the AGM update in October.

Let’s start with the very best part of the news. We are generating again. By the end of November 2023, we were in a position to begin trials with the repaired generator. They went well and the system progressed to full power generation in December. Encouragingly, no problems have been encountered and the generation achieved (kWh) exceeded the budgeted output for the month. We are cautiously optimistic that we can now continue uninterrupted generation throughout the year.

< Edited : . . . . Some details removed . . . .by me >

Some minor work remains to be completed, but essentially the scheme is now back up and running. Long may it continue.

Regards

XXXXXXXXX
Chair
LEG Power Lochaber Limited
4 kWp Solar PV : 50%/50% SE/SW : Solis Hybrid 3.6 : Pylontec 9.6 kWh
5 kW & 4kW Air-to-Air Mitsubishi Heat Pumps
Ripple : Graig Fatha & Kirk Hill . . . . plus various other renewable projects.
No Car : bicycles : bus & train
dan_b
Posts: 2287
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Another community hydro - Lochaber

#7

Post by dan_b »

Superb news.
Any photos you can share of it?
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
SporranMcDonald
Posts: 52
Joined: Thu Feb 16, 2023 10:29 am
Location: East Hampshire

Re: Another community hydro - Lochaber

#8

Post by SporranMcDonald »

dan_b wrote: Wed Jan 24, 2024 3:50 pm Superb news.
Any photos you can share of it?
Scenic location . . . .

https://legpower.coop/gallery/
4 kWp Solar PV : 50%/50% SE/SW : Solis Hybrid 3.6 : Pylontec 9.6 kWh
5 kW & 4kW Air-to-Air Mitsubishi Heat Pumps
Ripple : Graig Fatha & Kirk Hill . . . . plus various other renewable projects.
No Car : bicycles : bus & train
Post Reply