HVDC Interconnectors

Any news worthy story. Good things to watch at the Cinema, Theatre, on TV or have you read a good book lately?
AE-NMidlands
Posts: 2086
Joined: Wed Jun 02, 2021 6:10 pm

Re: HVDC Interconnectors

#231

Post by AE-NMidlands »

GarethC wrote: Wed Jan 03, 2024 5:16 pm About 2300 miles, am I right? How does that compare to longest existing interconnector?
probably makes it even more at risk of interference by some malefactor or other!
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
nowty
Posts: 5918
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: HVDC Interconnectors

#232

Post by nowty »

AE-NMidlands wrote: Wed Jan 03, 2024 6:40 pm
GarethC wrote: Wed Jan 03, 2024 5:16 pm About 2300 miles, am I right? How does that compare to longest existing interconnector?
probably makes it even more at risk of interference by some malefactor or other!
Allegedly the recent Viking link is the longest at 475 miles, or nearly 5 times as short.
Never going to happen what with political / security risks unless the UK government is going to insure it.
https://www.nationalgrid.com/national-g ... and-subsea
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#233

Post by dan_b »

VikingLink is currently the longest subsea HVDC interconnector at 745km in total (although some of that is on the ground).

The longest actual HVDC transmission line is in China (where else).
That is a 12GW (yes, 12!) connection which travels some 3200km overground in total from Zhundong to Wannan on transmission towers.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#234

Post by dan_b »

AQUIND update - the MoD has lodged an appeal against the project after the previous decision by Govt to not grant permission was overturned in the high court.

And so the plot thickens!
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Adokforme
Posts: 625
Joined: Sun Sep 19, 2021 10:09 pm

Re: HVDC Interconnectors

#235

Post by Adokforme »

Unashamedly copied from Ripple community page!
https://uk.finance.yahoo.com/news/brita ... EL4Us5C_4d
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#236

Post by dan_b »

I still can't quite believe this XLinks project is actually going to go ahead - the distance seems so extreme - but then as we've discussed often, the actual cost of the project is so much less than an equivalent 3.6GW of new nuclear, and it's a much less complex engineering project in the end I suppose - "Just" laying loads and loads and loads of cables.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
Joeboy
Posts: 8296
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: HVDC Interconnectors

#237

Post by Joeboy »

Thar ain't no cable laying ship. Looks like a billionaires plaything fitted with an Aframe!

Needs a big ass carousel on a 2 year leased vessel with two work class rovs and a survey crew.

I might come out of retirement for that contract! 🤔 :hysteria:

The time it takes to build and sea trial a vessel then a year of gremlins... Go to the existing market! Then again, still to build the cable manufacturing site....

This is YEARS out from being anything. :xl:

I'd very much like to see it succeed!
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#239

Post by dan_b »

Ooh nice, new interconnectors!

Tarchon Energy Link - that appears to be a new 1.4GW connection to Germany, so the 2nd to that country. Landfall in the UK is listed as "Essex".
They're claiming a commission date of 2030.

Lion Link is in a way a lot more interesting. Not least because it was previously known as "EuroLink" and since Brexit, any project with the word Euro in it is doomed for failure (or at least derision from the Daily Mail)...

So that one is a 1.8GW connection to The Netherlands, again the 2nd one to that country. with landfall in "Suffolk".
What makes it more interesting is that the route for this one will take it via a new Dutch-developed offshore windfarm - so power flows on that cable will be quite complex! They're again claiming a commission date of 2030 - whether that's the link alone, or also the windfarm is unclear.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
Joeboy
Posts: 8296
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: HVDC Interconnectors

#240

Post by Joeboy »

15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
Post Reply