Octopus saving sessions coming 1st Nov

Yuff
Posts: 481
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Octopus saving sessions coming 1st Nov

#1271

Post by Yuff »

nowty wrote: Thu Mar 21, 2024 12:01 pm Its on and its double jeopardy with two 30 min sessions :shock: , 17:30 to 18:00 and 18:30 to 19:00 but low volume again at 75MW, so small payouts.

But I would imagine Octopus will pay out £1.75 again irrespective of what happens in the bidding, going off past form. :xx:

Those with very small battery capacity will be able to re-charge during 18:00 to 18:30. :twisted:
Completed just in time for tomorrow’s webinar ……. :pot-stir:
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
User avatar
nowty
Posts: 5801
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#1272

Post by nowty »

Yuff wrote: Thu Mar 21, 2024 12:08 pm
nowty wrote: Thu Mar 21, 2024 12:01 pm Its on and its double jeopardy with two 30 min sessions :shock: , 17:30 to 18:00 and 18:30 to 19:00 but low volume again at 75MW, so small payouts.

But I would imagine Octopus will pay out £1.75 again irrespective of what happens in the bidding, going off past form. :xx:

Those with very small battery capacity will be able to re-charge during 18:00 to 18:30. :twisted:
Completed just in time for tomorrow’s webinar ……. :pot-stir:
Yep, that will make the full 12 hour's worth of test sessions, so I don't expect any more this season.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
AE-NMidlands
Posts: 2038
Joined: Wed Jun 02, 2021 6:10 pm

Re: Octopus saving sessions coming 1st Nov

#1273

Post by AE-NMidlands »

No invitation to join on my account yet, or an email. The 2nd March email came in at 1228 so there's time yet. Very grateful for the alert here, though.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
nowty
Posts: 5801
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#1274

Post by nowty »

Patience, the bidding process takes time.
And we might need to opt in a second time in the 18:00 to 18:30 lull period, hmmmm, seems engineered to catch folk out and reduce the cost.
Image
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
nowty
Posts: 5801
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#1275

Post by nowty »

Bids are in,

Octopus stuck to their guns and bid £1.75 and were rejected, but I'm sure they will still play at £1.75, especially as its almost certainly the last session. :xx:
British Gas did not bid again probably as a protest.

The bids which were accepted ranged from 42.5p to 74.9p.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
richbee
Posts: 604
Joined: Tue Apr 19, 2022 3:39 pm
Location: Northumberland

Re: Octopus saving sessions coming 1st Nov

#1276

Post by richbee »

Nothing yet....
Solar PV since July '22:
5.6kWp east/west facing
3.6kW Sunsynk hybrid inverter
2x 5.12kWh Sunsynk batteries
1.6kWp Hoymiles East/West facing PV on the man cave
Ripple DW 2kW
Ripple WB 200W
User avatar
nowty
Posts: 5801
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#1277

Post by nowty »

richbee wrote: Thu Mar 21, 2024 4:03 pmNothing yet....
Squeaky bum time, has the Octopus piggy bank finally been cleaned out ? :?
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Krill
Posts: 390
Joined: Fri Sep 02, 2022 4:38 pm

Re: Octopus saving sessions coming 1st Nov

#1278

Post by Krill »

45 minutes to show time, I doubt it's going ahead.
Solar PV: 6.4kW solar PV (Eurener MEPV 400W*16)
PV Inverter: Solis 6kW inverter
Batteries: 14.4kWh LiFePO4 batteries (Pylontech US5000*3)
Battery Inverter: LuxPowertek 3600 ACS*2 battery inverter
WBS: 8kW Hunter Avalon 6 Multifuel burner (wood only)
Tinbum
Posts: 1120
Joined: Mon May 31, 2021 9:55 pm

Re: Octopus saving sessions coming 1st Nov

#1279

Post by Tinbum »

It's interesting that the times would be 17.30 to 1800 and then 18.30 to 19.00. Another tweak of my node red required. :roll:
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
User avatar
nowty
Posts: 5801
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#1280

Post by nowty »

Looks like its "game over man" for this season, we might find out from tomorrows webinar what the future plans are for the Demand Flexibility Services.

18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Post Reply