Now we have official commencement on the 27th Nov,
I know there are no more guaranteed test sessions, but maybe there might be an initial shake off the cobwebs test event ?
27th / 28th look possible, especially the 28th, looking like low wind over Europe and we have 3 nuke turbines down.
22p (SS) + 15p (export) = 37p / kWh still interests me if I can flip it from 7p / kWh import.
And low payouts might turn into more sessions.
Octopus saving sessions coming 1st Nov
Re: Octopus saving sessions coming 1st Nov
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3