ASHP & triple glazing

Air source, ground source and associated systems for heating homes
User avatar
Joeboy
Posts: 8114
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: ASHP & triple glazing

#421

Post by Joeboy »

Richard77 wrote: Sun Nov 24, 2024 9:42 pm How much difference in performance though?

I was looking at some of the kooltherm k118 37.5mm dot n dabbed for the garage that's been k-rend silicone rendered on the outside.

Couldn't believe the price of the k118 :shock:

So was looking at similar thickness PIR and normal plasterboard, but didn't want to compromise too much on performance as will have no heating in the garage for now.

Couldn't be bothered with the added expense of studding out the walls, etc.
Oh there will be a difference. I've not hunted that figure down though. More happy to just upgrade at £300 rather than nearer £800 and know I'm improving the 7.9kW heat loss calc slightly.

TBH, I'm suffering from early onset RE fatigue and a very, very slight case of cantbearseditis. :lol:

Don't get me wrong, I'm into it but not to K118 prices. The original build fabric doesn't justify it. :xl:
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Richard77
Posts: 77
Joined: Thu Sep 19, 2024 3:26 pm

Re: ASHP & triple glazing

#422

Post by Richard77 »

I understand perfectly mate....

I've got this garage to finish and I'm sick to the death of of it. Just want it done as quick and as cheap as possible.

I need to sort the floor out, old concrete slab at the moment. Need to screed it just to level it out. Probably only needs about 50mm, but too much to just keep on pouring self leveller on it!

Then need to come up a plan with the inside walls.

Then need find a garage door which all seem ridiculously expensive!

Then get the solar guys in to start the ball rolling putting the panels on the garage roof and installing leccy and inverter in garage.

Then hopefully the batteries I ordered off Colin arrive before Christmas!

All seems so far away and Xmas is getting closer hehe
NoraBatty
Posts: 142
Joined: Sat Mar 23, 2024 10:40 am

Re: ASHP & triple glazing

#423

Post by NoraBatty »

My reply has gotten lost.
Normal pir will be 0.022w/mk and phenolic 0.019.

Check out seconds and co for their cheap pir stuff.
https://www.secondsandco.co.uk/?gad_sou ... W3EALw_wcB

They also do insulated plasterboards. It really is good quality stuff. I ordered my i
Pir from them and its wrinkles in the foil facing thats caused it to be seconds. 🙄
Not as cheap as it was for delivery as their scotland branch has shut i think, but if you are waiting anyway i may want to order some more at the same time, and maybe anyone else up here can also do so too so the shipping costs are cheaper.
They did used to do a collection swrvice.
And they also had pallets of scrap you could collect for £1!!
2.7kw Canadian solar. roof. 3kw solis G98 mcs
12kw midea ASHP
200l hot water
3152W RE, Whitelaw Brae
Octopus agile/outgoing fixed 15p

Planned;
Hybrid system
43kwh eve batteries, 3x16 280A
6-8+kw solar, DC connected.
User avatar
Colin Deng
Posts: 201
Joined: Mon Nov 21, 2022 8:33 am

Re: ASHP & triple glazing

#424

Post by Colin Deng »

Richard77 wrote: Sun Nov 24, 2024 9:55 pm I understand perfectly mate....

I've got this garage to finish and I'm sick to the death of of it. Just want it done as quick and as cheap as possible.

I need to sort the floor out, old concrete slab at the moment. Need to screed it just to level it out. Probably only needs about 50mm, but too much to just keep on pouring self leveller on it!

Then need to come up a plan with the inside walls.

Then need find a garage door which all seem ridiculously expensive!

Then get the solar guys in to start the ball rolling putting the panels on the garage roof and installing leccy and inverter in garage.

Then hopefully the batteries I ordered off Colin arrive before Christmas!

All seems so far away and Xmas is getting closer hehe
It will be arrived at the port at 18th Dec.
Then will be the custom clearance , after that, it will be delivery to door
Hopefully can delivery before Christmas
Colin Deng(Batterycolin)
Battery supplier for battery cells and pack
Email:guohed070@gmail.com
https://www.linkedin.com/in/colin-deng-2b4277238/
AGT
Posts: 992
Joined: Sat Jan 29, 2022 11:26 am

Re: ASHP & triple glazing

#425

Post by AGT »

Richard77 wrote: Sun Nov 24, 2024 9:55 pm I understand perfectly mate....

I've got this garage to finish and I'm sick to the death of of it. Just want it done as quick and as cheap as possible.

I need to sort the floor out, old concrete slab at the moment. Need to screed it just to level it out. Probably only needs about 50mm, but too much to just keep on pouring self leveller on it!

Then need to come up a plan with the inside walls.

Then need find a garage door which all seem ridiculously expensive!

Then get the solar guys in to start the ball rolling putting the panels on the garage roof and installing leccy and inverter in garage.

Then hopefully the batteries I ordered off Colin arrive before Christmas!

All seems so far away and Xmas is getting closer hehe


What about giving it a coat of SBR and a ready mix delivery of concrete straight into the floor?
Richard77
Posts: 77
Joined: Thu Sep 19, 2024 3:26 pm

Re: ASHP & triple glazing

#426

Post by Richard77 »

Cheers AGT.... Nice one Colin for update.

I will probably get round to having a go screeding it myself, didn't look too hard on YouTube. 8-)

Currently been knocked out with man flu and feeling sorry for myself!
User avatar
Joeboy
Posts: 8114
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: ASHP & triple glazing

#427

Post by Joeboy »

The guys were back today and made good progress. All rads now hung, CU for ASHP installed, tank pipework started and both expansion vessels fitted in loft. The only downer is that the guys have to go to another job for the next couple of days, This was sprung on us and I've made it clear that i'm unhappy with the owners style of communication. Lack of thought for client life and other commitments.

The guys will be back on Thursday and Friday, then Tuesday. I'm taking that time across the weekend and Monday to nip down to the South coast to collect the RV.

My worry is that the company takes on too much work and comms suffer as they have today. Growing pains I suppose and a sign of success?

I reckon there are another 3 to 4 days of work to finish this. So far we've had 2 full 2 man days and 1 full 1 man day.

Image

Image

Image

Image

Image

Image

Image

Image
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
NoraBatty
Posts: 142
Joined: Sat Mar 23, 2024 10:40 am

Re: ASHP & triple glazing

#428

Post by NoraBatty »

Just got this email from seconds and co.
may be worth a look on friday.


Image
2.7kw Canadian solar. roof. 3kw solis G98 mcs
12kw midea ASHP
200l hot water
3152W RE, Whitelaw Brae
Octopus agile/outgoing fixed 15p

Planned;
Hybrid system
43kwh eve batteries, 3x16 280A
6-8+kw solar, DC connected.
User avatar
Joeboy
Posts: 8114
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: ASHP & triple glazing

#429

Post by Joeboy »

NoraBatty wrote: Tue Nov 26, 2024 3:10 pm Just got this email from seconds and co.
may be worth a look on friday.


Image
Nice one!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 8114
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: ASHP & triple glazing

#430

Post by Joeboy »

Had a molar pulled 3 hours ago. The throb is just kicking in now... :(

Might stack a few logs to take mind off it!

Had a clean up today, place looks much better with the rads out the way and now on walls. No grit or debris on floors. Call it 1/2 time. : :D

The logs did the trick! As did a towel wrapped icebag and A Guiness. :lol:

Image
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Post Reply