Being a microgeneration site for the grid
Re: Being a microgeneration site for the grid
DNO got back to me today. The system was never registered by the Installation Co!
I've filled in a G98 self assessment/declaration/retroactive type form and sent it back to them along with my HIES & MCS certs. If that is accepted ok the system will be registered and they'll send me a mail to forward to Octopus.
I've filled in a G98 self assessment/declaration/retroactive type form and sent it back to them along with my HIES & MCS certs. If that is accepted ok the system will be registered and they'll send me a mail to forward to Octopus.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Being a microgeneration site for the grid
A new milestone, confirmed awareness from DNO of our system. That mail.(thanks Nowty) has now been sent to Octopus. Also adding SWMBO's name to the Octopus account as the FIT is in her name. That should be all hurdles cleared. Just waiting for confirmation from the big O. Would like to do a bit of powershifting while in Turkey. Fingers .
AC/DC were excellent last night as was my leg about.that there London today.
AC/DC were excellent last night as was my leg about.that there London today.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Being a microgeneration site for the grid
Well, I've done all I can to facilitate the smooth transition from BG FIT deemed export to Octopus outgoing fixed. Up to and including a photo sent in yesterday of my smart meter export reading of 1001kWh total.
The original blurb did say 6 weeks to process so it's on track.
Application went in on 1st July
Not a fan of this waiting though.
The original blurb did say 6 weeks to process so it's on track.
Application went in on 1st July
Not a fan of this waiting though.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Being a microgeneration site for the grid
[quote=Joeboy
Not a fan of this waiting though.
[/quote]
Hope you’re not turning into the Amazon prime generation now!!
Not a fan of this waiting though.
[/quote]
Hope you’re not turning into the Amazon prime generation now!!
Re: Being a microgeneration site for the grid
Hope you’re not turning into the Amazon prime generation now!!
[/quote]
I don't know what that is but I can surmise! No, I'm not becoming an APG.
Its a feeling holdover from 5 months to arrange for a smart meter at No1's house. I'm sure it will be fine, I've actually been impressed by both DNO assistance and Octopus pointing out the SWMBO is FIT holder while account is in my name, (although they didn't name her for privacy). I was reflecting on what an idea it is, all these Micro gen plants nationwide, nodal if demand and siting follows countrywide population density. Clever stuff indeed!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Being a microgeneration site for the grid
Just kidding, I think it’s the yoof of today who want everything straight away.
I’ve been dealing with my DNO at work for 3 years to get a transformer moved , they are pretty useless.
I’m also dealing with my DNO at home as when they fitted my smart meter last year, they removed the double pole isolator that allowed you to work safely after the metering equipment!
I want to remove my old generator changeover switch and tidy things up
I’ve been dealing with my DNO at work for 3 years to get a transformer moved , they are pretty useless.
I’m also dealing with my DNO at home as when they fitted my smart meter last year, they removed the double pole isolator that allowed you to work safely after the metering equipment!
I want to remove my old generator changeover switch and tidy things up
Re: Being a microgeneration site for the grid
No worries! It can all be a bit hit & miss when engaging with these companies. I'd like to have been playing about with export settings when over in Turkey which is next week but I'm aiming/resigned to it being the Oct visit..AGT wrote: ↑Mon Jul 08, 2024 11:31 am Just kidding, I think it’s the yoof of today who want everything straight away.
I’ve been dealing with my DNO at work for 3 years to get a transformer moved , they are pretty useless.
I’m also dealing with my DNO at home as when they fitted my smart meter last year, they removed the double pole isolator that allowed you to work safely after the metering equipment!
I want to remove my old generator changeover switch and tidy things up
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Being a microgeneration site for the grid
It could be around the same time as we get the KH dashboard live feed
Moxi
Moxi
Re: Being a microgeneration site for the grid
Next Spring?!! Hopefully see a few quid into Ripple account from KH next day or so.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Being a microgeneration site for the grid
That will be a nice first for us here to see some KH credit plus I need some physical evidence for the mother in law so that I can convince her to put her heating on a bit more as it wont cost her anything extra. Shes good with the batteries and panels and watches the load rise before doing her washing drying and ironing but she wont take the next step and pop the heater on when she's feeling the cold.
Woke up around 2 am this morning to extremely windy Easterlies and as this is an unusual direction for us I had to pop out and just check a few things including some propped PV were going to be ok. The wind has swung round to a WSW direction again now so it must have been the low passing overhead at 2am. Not as wet as previously forecast and a brighter overcast than expected but still unseasonably
Moxi