Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3931

Post by nowty »

Sim_C wrote: Fri Nov 15, 2024 2:47 pm So the first batch of the DW solar panels are now mounted on their frames, with a gold standard array checked and available for comparison when completing the rest.

Image

The sequence of works as described by Ripple is to complete construction followed by energisation and commissioning. I would have thought this could be done on a field by field basis rather than waiting for all construction to be finished, unless of course the MV switchgear and LV distribution is not ready yet.

Does anyone remember if the previous wind turbines were all commissioned at the end, or brought online sequentially?
All the wind turbines were fully built prior to energising and commissioning, they were brought online individually, but it was in the last phase over a couple of weeks.
17.5kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3