Octopus saving sessions coming 1st Nov

Yuff
Posts: 430
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Octopus saving sessions coming 1st Nov

#521

Post by Yuff »

Are you guys all former electricians :lol:

Managed to trip the fuse board yesterday in the in day adjustment window, whilst on my way out, luckily, as swmbo, would not have done anything to reset it and I would have missed out on 20kWh use.
Then as Swmbo Refused to eat dinner outside the 6:30-7:30 window I had to cook dinner during that period using 2 induction jobs and the oven, which I managed to do using batteries( my inverter only allow just over 2.6kw) so quite tricky when the feeder tank to the heat pumps tops itself up but managed it.
Then with 20 mins to go I noticed my usage increasing and realised I had forgotten to switch the timer off for the central heating. I could have switched the heat pumps off at the cut off but not too keen to mess around with them. So ended up using 0.75kwh from the grid :oops:

I get a bit jittery about the adjustment window as a blew the 60 amp fuse in November at 21400w it’s now an 80 amp fuse, still waiting for the electrician to swap the sub main to a 100 amp, so when I’m using 18-22kwh I get a bit twitchy
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#522

Post by nowty »

Heads up,
A surprise maybe for tomorrow ?

From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. DFS Tests are scheduled for tomorrow Tuesday 21/03/2023 This is an indication that DFS Service Requirements might be published today at 14:30 for Providers being tested. Tests will be System Tagged. For full details see the ESO Data Portal at https://data.nationalgrideso.com/dfs/de ... est-events. Notification Issued at 10:00 hours on 20/03/2023. Issued by Simon Williams National Grid Electricity National Control Centre.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Tinbum
Posts: 1075
Joined: Mon May 31, 2021 9:55 pm

Re: Octopus saving sessions coming 1st Nov

#523

Post by Tinbum »

Possibly another onboarding- wind looks good.
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#524

Post by nowty »

Tinbum wrote: Mon Mar 20, 2023 10:33 am Possibly another onboarding- wind looks good.
Probably, I think Utilita have only had one onboarding session,

But that begs the question will there be two more test sessions later in this final month as new onboarded providers are guaranteed another 2 test sessions in their first month and I have never seen a test session (non onboarding) for only a subset of providers. :twisted:
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Tinbum
Posts: 1075
Joined: Mon May 31, 2021 9:55 pm

Re: Octopus saving sessions coming 1st Nov

#525

Post by Tinbum »

Not sure but my flow is already complicated enough!! :? :?
Image

Image
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#526

Post by nowty »

Only an onboarding session confirmed, but that may mean another two sessions might still be on the cards.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#527

Post by nowty »

Another heads up for a possible test session tomorrow Thurs 23rd. I note the last "onboarding" session for two new suppliers was their second (and last) one, so more chance of a normal test event tomorrow.

So look back here at around 2.30 this afternoon for an update.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#528

Post by nowty »

Test event between 18.30 and 19.30 tomorrow 23rd March with a 300MW requirement.

Boom, almost certain Octopus will be in it, head back here at 4.30PM to find out for certain.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 7798
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Octopus saving sessions coming 1st Nov

#529

Post by Joeboy »

nowty wrote: Wed Mar 22, 2023 2:31 pm Test event between 18.30 and 19.30 tomorrow 23rd March with a 300MW requirement.

Boom, almost certain Octopus will be in it, head back here at 4.30PM to find out for certain.
Woohoo! :)
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 7798
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Octopus saving sessions coming 1st Nov

#530

Post by Joeboy »

Joeboy wrote: Thu Mar 16, 2023 6:54 am
marshman wrote: Wed Mar 15, 2023 11:51 pm You need to check ALL the cells at the same time. One cell could be up at 3.7 V and most of the others still below 3.5V. hence why Pylons were still charging.

I did comment in another thread that if you are relying on a balancing board alone and have no BMS then the balance board needs a current capability to mach the max charge current to catch a "runaway" cell. Though that us just my view🙂
Good point, I will check this. Cheers!
Just a quick note of thanks to Marshman. We had enough solar today to monitor the top few percent of charge. It turns out that there were two things happening. Firstly the blue lcd gauge showing cell voltage is inaccurate at the top end while current is flowing. By as much as 0.06V but more average being 0.04V. The cells themselves were all within 0.01V of each other but the Victron unit was set too high for cutoff. I've wound it back a bit and I'm retesting. Looking better already.
Thanks again.

I understand where you are coming from on the bms load shifting capacity but I did see the pylontechs shutdown in parameters today and hopefully with the Victron cutting out a little earlier we won't see high voltages again. Never a dull moment in RE land!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Post Reply