Re: HPC

#111

Post by Moxi »

Fintray wrote: Wed Oct 23, 2024 11:07 am
Moxi wrote: Wed Oct 23, 2024 9:25 am If the treasury wants to get angry then they need to dig up Mr Attlee and Mrs Thatcher and have a very strong conversation because that's where the costs originated, its no good moaning at the present group of people wrestling with the national legacy issue.

Moxi
Nooo, I think a lot of people would agree she's in the best place for her, didn't they build a huge concrete cover over her, erm no that was Chernobyl, both pretty toxic...
:lol:
dan_b
Posts: 2246
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#112

Post by dan_b »

Webinar on the recent "divergence" operations at Flamanville 3 - some very techie info here

Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2246
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#113

Post by dan_b »

Flamanville 3 is now up to 9% of its output as EDF continues to complete the commissioning of its long-overdue, hugely over-budget EPR reactor...

https://actu.fr/economie/lepr-de-flaman ... 88351.html
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2246
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#114

Post by dan_b »

This won't help the completion timeline for Hinkley Point C - some workers are on strike

https://www.bridgwatermercury.co.uk/new ... y-dispute/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1270
Joined: Mon Jun 14, 2021 1:17 pm

Re: HPC

#115

Post by Mart »

dan_b wrote: Wed Oct 30, 2024 1:49 pm Flamanville 3 is now up to 9% of its output as EDF continues to complete the commissioning of its long-overdue, hugely over-budget EPR reactor...

https://actu.fr/economie/lepr-de-flaman ... 88351.html
How long is it going to run for, before it has to shutdown for the faulty/cracked reactor lid to be replaced?
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
dan_b
Posts: 2246
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#116

Post by dan_b »

It will be replaced after the reactor's first operating cycle, so 15 to 18 months after it's actually generating and consuming fuel in meaningful quantities I guess.

No new info about how the path to actual power generation is going, but I guess no news is good news.