Part ownership of a Ripple Wind Turbine, fancy it?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Fair play to you for chasing them up John
At best, its disgraceful, they never followed up on their assurance with a message back on 12 September, as promised. Six weeks back now.
Surely if they havent got a clue as to the timing requirements their accountants would have been telling them?
Very bizarre
At best, its disgraceful, they never followed up on their assurance with a message back on 12 September, as promised. Six weeks back now.
Surely if they havent got a clue as to the timing requirements their accountants would have been telling them?
Very bizarre
4.0kw FIT PV solar Sunnyboy 4000tl & 7 x 570w JA solar panels
7.08kw JA Solar panels & Sunsynk ECCO 3.6kw.
7 x US5000 Pylontechs.
4500l RWH
Full Biomass heating system
iBoost HW divertor
Full house internal walls insulation
600min Loft insulation
7.08kw JA Solar panels & Sunsynk ECCO 3.6kw.
7 x US5000 Pylontechs.
4500l RWH
Full Biomass heating system
iBoost HW divertor
Full house internal walls insulation
600min Loft insulation
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Ripple seem to be prone to ignorance/mistakes/cock-ups/whatever they are.
Does anybody know a journalist who might take up the question and find out why or even get it sorted?
Does anybody know a journalist who might take up the question and find out why or even get it sorted?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Yeah I know the perfect person - hes been an advocate of Ripple so he will be keen to clear up anything awry for his personal good standing - if people want to escalate this then Martin Lewis would be a great place to start in my opinion.
Moxi
Moxi
-
- Posts: 2063
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I've had emails about this (15.34,) surprised they haven't been mentioned earlier:
We want to give you an update on the Kirk Hill Coop annual accounts. Some of you will be aware the 2022 and 2023 annual accounts for Kirk Hill Coop have not yet been submitted to the FCA. We received formal notice from FCA that the Coop has until 24 December 2024 to submit the accounts or risk cancellation of the coop. This notice is reflected on the FCA’s website. We are in contact with the FCA over the matter.
I want to assure you that we have been working on the accounts with our auditors for a number of months. It has taken longer than anticipated, but the vast majority of the work is now complete. We expect to have both sets of audited accounts ready for approval within 10 days when we will issue a notice for the AGM to be held.
The coop board is aware of the issue. The delay to the accounts has been discussed at multiple coop board directors meetings and the urgency of the situation stressed to all involved.
We sincerely apologise for the delay and the concern this has caused some members of the coop and its Directors. There are clear learnings we will take to ensure our compliance procedures run much more efficiently in future.
We look forward to discussing this with you in more detail at the AGM.
Sarah Merrick
Founder & CEO
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Quite a nice video update on Derril Water I thought,
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Hope that's not reels of SWA!
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: Part ownership of a Ripple Wind Turbine, fancy it?
We passed quite a few of these farms in various stages of construction and on this scale during our Euro mini tour. A different sort of impressive compared to WT's but great to see.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
or twin and earth ..............
1750w Vertical PV micro inverters
3800w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
3800w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Just in from Ripple :-
Further to our update last week regarding the delay to the accounts and the subsequent FCA notice, we are now in a position to issue a formal notice of the AGM (formal notice to follow on Monday) to approve the delayed accounts.
We sincerely apologise for the delay and the worry that this may have caused you. We know we must do better going forward and that we have some work to do to deliver the high standards our members rightly expect from us.
We will be reviewing all compliance procedures and will be putting steps in place to ensure compliance and communications to members is greatly improved going forward.
We look forward to discussing this with you at the AGM
If you have any questions please let us know by emailing us at support@rippleenergy.com
All the best,
Team Ripple
Further to our update last week regarding the delay to the accounts and the subsequent FCA notice, we are now in a position to issue a formal notice of the AGM (formal notice to follow on Monday) to approve the delayed accounts.
We sincerely apologise for the delay and the worry that this may have caused you. We know we must do better going forward and that we have some work to do to deliver the high standards our members rightly expect from us.
We will be reviewing all compliance procedures and will be putting steps in place to ensure compliance and communications to members is greatly improved going forward.
We look forward to discussing this with you at the AGM
If you have any questions please let us know by emailing us at support@rippleenergy.com
All the best,
Team Ripple
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: Part ownership of a Ripple Wind Turbine, fancy it?
So the first batch of the DW solar panels are now mounted on their frames, with a gold standard array checked and available for comparison when completing the rest.
The sequence of works as described by Ripple is to complete construction followed by energisation and commissioning. I would have thought this could be done on a field by field basis rather than waiting for all construction to be finished, unless of course the MV switchgear and LV distribution is not ready yet.
Does anyone remember if the previous wind turbines were all commissioned at the end, or brought online sequentially?
The sequence of works as described by Ripple is to complete construction followed by energisation and commissioning. I would have thought this could be done on a field by field basis rather than waiting for all construction to be finished, unless of course the MV switchgear and LV distribution is not ready yet.
Does anyone remember if the previous wind turbines were all commissioned at the end, or brought online sequentially?
East Midlands
6x410W-East-Roof
10x410W-West-Roof
GivEnergy 5 kW Gen2 hybrid + 9.5 kWh battery
6x375W-South-Vertical
Solax 3.68 kW inverter
Zappi-Eddi
HI5-77 kWh
Ripple-PV-3kW/2900kWh-Wind-600W/1450kWh-UnderConstruction
6x410W-East-Roof
10x410W-West-Roof
GivEnergy 5 kW Gen2 hybrid + 9.5 kWh battery
6x375W-South-Vertical
Solax 3.68 kW inverter
Zappi-Eddi
HI5-77 kWh
Ripple-PV-3kW/2900kWh-Wind-600W/1450kWh-UnderConstruction