Looks like a couple of gentle breeze days upcoming on site at Graig Fatha so I feel confident saying that in the first month of operation bearing in mind that the slow spool up is in the mix along with the 500hr checks/service/shutdown AND the DNO repeatedly sending a signal to the turbine to slow down we (that's SWMBO & Me) generated 0.43MWh of clean wind power!

Our predicted generation for the year is 6,972kWh at GF, so that's a little over 6% of annual prediction generated in a month. A month when the wind is slowing down and all the start up teething problems. We are more than happy with that, Ripple faltered in their comms a little at the start but seem to be getting up to speed on that quite well and there are mods in the pipeline for dashboard and automation so that's all excellent.

I love the idea that those electrons generated are gone, instantly used in the surrounding villages at site. A small 2 fingers to Putin if you will. :twisted:

As previously discussed, the 9.5p per kWh should be showing up in the coming weeks, a little over £40, 0.88495% roi to be precise. :)

It's looking good, I enjoyed the ITV segment last night. A sadness that they could not mention Kirkhill.. No matter, at least the idea of it was newsworthy. :D
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1112

Post by Joeboy »

Had a dream a couple of nights back and in it I had this cool 3d app showing live generation and moving parts on each of my land based and offshore wind turbines, was just waiting for the hydroturbine display to go live in the dream, was epic! :D
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1113

Post by Joeboy »

Ripple update.


Kirk Hill update: pre-construction phase is well underway

14/04/2022

Kirk Hill's share offer will close midnight 3rd May. Due to a recent surge in new member interest and in conjunction with corporate and bank funding, we are on track for the purchase to complete on time. We strongly advise members who plan to increase their ownership to do so quickly to avoid disappointment.

We are well underway with the pre-construction work. Right now we are continuing to work on contracts in the build up to completing the purchase of the project at the end of this month. Once the share offer has closed we will send you a full update on the construction plans and keep you informed of the build progress every step of the way.

First bills savings are on their way!

14/04/2022

Graig Fatha has been energised for one full month. That can only mean one thing. Your first bill savings are on their way!

Next week your Ripple dashboard will be updated to show your savings as well as your generation. The savings themselves should appear on your Octopus account later in the month. Look out for them in the 'Balance history' of your Octopus account. We will let you know the date the savings will appear as soon as it's confirmed.

:D Good eh? 👍
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1114

Post by Joeboy »

:Not sure if the Kirkhillians get this update so thought you'd like to know that Ripple are on it and communicating well.

Turbine performance and data feed 


You may have noticed some occasions when your dashboard was showing low or zero generation. This has been for a number of reasons:


1. Loss of connection to the data feed

There have been a number of occasions when we've lost the data feed showing the turbine generation. When this has happened your dashboard has shown zero generation, even though the turbine has been operating normally.  We have relocated the antenna and are working with the turbine company to improve connectivity to the turbine.


2. Grid curtailments 

The grid company's control equipment has sent signals to the turbine to stop on a number of occasions. We have investigated this in some depth and adjusted settings relating to the power factor. Since the settings were changed there have not been any further curtailment events but we will continue to monitor this.  


3. The turbine has undergone checks and its 500 hour service

The turbine has undergone its 500 hours service.  Whenever there is someone working inside the turbine it needs to be switched off. This obviously causes generation to drop to zero whilst the work is carried out.


We recognise you want speedy updates from us when generation looks lower than normal. Rest assured we are dedicated to getting you updates as soon as we can. Once we have explored any potential down time or data feeds losses with the relevant third parties, we will let you know via your dashboard as soon as possible.   

Dashboard improvements are on their way


We have made improvements to your customer dashboard based on recent feedback from members. We can't wait to share it with you over the coming weeks. We will continue to improve our platform as we grow, so please keep your comments coming! They genuinely help shape the direction of our plans.   

Coming to Fully Charged Live this month? Come and see us for your exclusive member gift 


We'll be at Fully Charged Live 2022, Farnborough, 29th April-1st May. We know many of you will be there too. Come by our stand, situated opposite the Home Energy Advice section, and say hello. As a extra special treat, if you come by at 12 noon on any day of the event, we've got an exclusive Ripple member gift just for you! It's a great chance to meet Sarah Merrick, Team Ripple and your fellow Ripple members. 



Ripple in the news


We're really pleased to have been featured in the Telegraph, the Times and on ITV News this week. 


We are also delighted to be finalists in the Business Green Renewable Energy Project of the Year (Graig Fatha) and Marketing Campaign of the Year (Kirk Hill).  We're looking forward to the results in June!  
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5783
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1115

Post by nowty »

My WT1 generation is so tantalisingly close to 0.5MWh after the first 30 days of operation and averages 75% of baseline generation. Given the outages due to teething problems and the 500hr service, I give it a thumbs up. :mrgreen:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1116

Post by Joeboy »

nowty wrote: Thu Apr 14, 2022 4:16 pm My WT1 generation is so tantalisingly close to 0.5MWh after the first 30 days of operation and averages 75% of baseline generation. Given the outages due to teething problems and the 500hr service, I give it a thumbs up. :mrgreen:
Nice feeling eh? More to come too, looking forward perversely to the tail end of the year to really see it crank. Glad they got the tappings sorted.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Inskip75
Posts: 66
Joined: Thu Jun 10, 2021 6:42 am

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1117

Post by Inskip75 »

Just bought a bit more Kirk Hill to take our total across both to 2kW just to round the figures!
5.6kW PV
0.8kW WT1 and 1.2kW WT2
9.6kWh batteries
3.5kW+2.5kW ASHP
Zappi
Seat Mii Electric
Adokforme
Posts: 621
Joined: Sun Sep 19, 2021 10:09 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1118

Post by Adokforme »

We'll be at Fully Charged Live 2022, Farnborough, 29th April-1st May. We know many of you will be there too. Come by our stand, situated opposite the Home Energy Advice section, and say hello. As a extra special treat, if you come by at 12 noon on any day of the event, we've got an exclusive Ripple member gift just for you! It's a great chance to meet Sarah Merrick, Team Ripple and your fellow Ripple members.
We've booked tickets for the Saturday. Anyone else planning to go?
User avatar
nowty
Posts: 5783
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1119

Post by nowty »

Next few days looks like a good test to see whether the new power factor settings on WT1 will stop the DNO shutting it down.

Should be running at high output 24/7 for at least 3 days. :twisted:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
AE-NMidlands
Posts: 2024
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1120

Post by AE-NMidlands »

nowty wrote: Wed Apr 20, 2022 1:00 pm Next few days looks like a good test to see whether the new power factor settings on WT1 will stop the DNO shutting it down.

Should be running at high output 24/7 for at least 3 days. :twisted:
If it does it will make a nice change from its output being about a quarter of the daily projections...
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!