Nuclear drop
Nuclear drop
Seems to have been a big drop (ramp down) in Nuclear power at 5.30 ish today? (About 1.2Gw)
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Nuclear drop
Had a look on the status page and cannot see anything to suggest why or where yet - but maybe the page doesnt get updated in real time
https://www.edfenergy.com/energy/power- ... y-statuses
Its the first time i have visited the status page for a while and was a bit of a shock how short the station list is now that Dungeness and Hunterston are off the list.
Moxi
https://www.edfenergy.com/energy/power- ... y-statuses
Its the first time i have visited the status page for a while and was a bit of a shock how short the station list is now that Dungeness and Hunterston are off the list.
Moxi
Re: Nuclear drop
Yes, I'd looked but it was for 14th April..
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Nuclear drop
Dropped even more at 10.45 last night. Seems strange when CCGT is so high.
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Nuclear drop
Definitely something amiss, I wonder if thy have hit problems with bringing Hartlepool unit two back up to full power and had to shut down again ?- that said on its own that unit would not account for the 1.2GW you mentioned so there has to be another station with both units offline which would suggest either Heysham stage two , Torness or Sizewell.
It will take EDF some time to sort out whats going on and get themselves set up to attend to the situation and only then will we get a played down version of whats going on.
Hopefully nothing that cannot be fixed quickly
Moxi
It will take EDF some time to sort out whats going on and get themselves set up to attend to the situation and only then will we get a played down version of whats going on.
Hopefully nothing that cannot be fixed quickly
Moxi
Re: Nuclear drop
I noticed this too, and could not understand at first but the status messages of each station are now several days old probably because of Easter. Looks like maybe another major breakdown as there are no imminent planned outages mentioned.
My own recollection of the nuclear industry is things tend to go wrong on night shift or bank holidays as the day maintenance teams are not there.
My own recollection of the nuclear industry is things tend to go wrong on night shift or bank holidays as the day maintenance teams are not there.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Nuclear drop
At the moment it's down 1.84Gw from yesterday afternoon, that's about 3 reactors or about 1/4 of our nuclear!
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Nuclear drop
Mystery over, page updated.
Sizewell B completely offline - Unplanned automatic trip. Cause being investigated.
And Torness Reactor 1 offload refuelling.
Heysham 1 Reactor 2 on planned outage we already knew about.
https://www.edfenergy.com/energy/power- ... y-statuses
Sizewell B completely offline - Unplanned automatic trip. Cause being investigated.
And Torness Reactor 1 offload refuelling.
Heysham 1 Reactor 2 on planned outage we already knew about.
https://www.edfenergy.com/energy/power- ... y-statuses
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Nuclear drop
Don't like to be spamming my own link but if you are curious in future which plants specifically are running or not (and not just nuclear - you just drill down by clicking on a fuel type) I built a thing: https://terravolt.co.uk/uk-grid-visual/
Won't tell you the "why" part - but it does update far more often than the EDF page.
Won't tell you the "why" part - but it does update far more often than the EDF page.
Givenergy 5kW Hybrid, Givenergy 8.2kWh Battery, Goodwe 2.5kW DC Coupled + 3x Pylontech 2.4kWh.
6.2kW PV (JA Solar 340W x 18)
6.2kW PV (JA Solar 340W x 18)
Re: Nuclear drop
We like that sort of spam.hoggy wrote: ↑Tue Apr 19, 2022 3:38 pm Don't like to be spamming my own link but if you are curious in future which plants specifically are running or not (and not just nuclear - you just drill down by clicking on a fuel type) I built a thing: https://terravolt.co.uk/uk-grid-visual/
Won't tell you the "why" part - but it does update far more often than the EDF page.

18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3