More Renewable Shenanigans at Stinsy Towers
More Renewable Shenanigans at Stinsy Towers
Right!
Formal sign-off from SWMBO has been received! I'm officially copying Nowty's A2A installation!
Been on the blower to Octopus today and am going for Octopus Go Faster 7.5/35p 0230-0630 from August (having previously been on 5/15p 2030-0030). I currently pay 7.5p/kWh for gas and expect that to rise to 15ish p/kWh by October.
The HP with a COP of 4 gives me an effective 1.9p/kWh of heat output in the cheap period and 8.75p/kWh on peak electric. Which is a no-brainer compared to gas (at my assumed prices) so the HP can work 24/7 rather than just in the cheap-period. The new timeslot will mean my resistive heating is used to get the house up to temperature in the morning rather than to maintain overnight temperatures. Also timing the dishwasher/washing machine is more complex and creates noise concerns (DS2 sleeps above the washer).
Actual A2A HP installation will be end of this month / beginning of next month. And there are a few complications: External unit is going high on a wall, internal unit is going on an internal wall so I'll need to install a condensate pump, power will be on a new circuit with a long run needed. I don't see the install being a one-day-wonder but plenty of time 'till winter!
I'm not very good at posting step-by-step pictures (I'm a bit "in the zone" while working) but I'll do my best keep you guys up-to-date on progress/results.
Formal sign-off from SWMBO has been received! I'm officially copying Nowty's A2A installation!
Been on the blower to Octopus today and am going for Octopus Go Faster 7.5/35p 0230-0630 from August (having previously been on 5/15p 2030-0030). I currently pay 7.5p/kWh for gas and expect that to rise to 15ish p/kWh by October.
The HP with a COP of 4 gives me an effective 1.9p/kWh of heat output in the cheap period and 8.75p/kWh on peak electric. Which is a no-brainer compared to gas (at my assumed prices) so the HP can work 24/7 rather than just in the cheap-period. The new timeslot will mean my resistive heating is used to get the house up to temperature in the morning rather than to maintain overnight temperatures. Also timing the dishwasher/washing machine is more complex and creates noise concerns (DS2 sleeps above the washer).
Actual A2A HP installation will be end of this month / beginning of next month. And there are a few complications: External unit is going high on a wall, internal unit is going on an internal wall so I'll need to install a condensate pump, power will be on a new circuit with a long run needed. I don't see the install being a one-day-wonder but plenty of time 'till winter!
I'm not very good at posting step-by-step pictures (I'm a bit "in the zone" while working) but I'll do my best keep you guys up-to-date on progress/results.
Last edited by Stinsy on Tue Oct 17, 2023 7:17 pm, edited 1 time in total.
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: More Renewable Shenanigans at Stinsy Towers
Stinsy, we like photo's, you know that! 

15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
-
- Posts: 650
- Joined: Mon May 31, 2021 7:16 pm
- Location: ville of spiky things
Re: More Renewable Shenanigans at Stinsy Towers
I'm not very good at posting step-by-step pictures (I'm a bit "in the zone" while working) but I'll do my best keep you guys up-to-date on progress/results.
it can be a bit of a faff, I sometimes set up my lappy somewhere strategic and set the timer to get some pics, or even a timelapse of the day.
Desp
it can be a bit of a faff, I sometimes set up my lappy somewhere strategic and set the timer to get some pics, or even a timelapse of the day.
Desp
Blah blah blah
Re: More Renewable Shenanigans at Stinsy Towers
Postman has been:


12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: More Renewable Shenanigans at Stinsy Towers
I've made a cup of coffee and I am sat in my comfy chair waiting for the first progress report
I do love stuff that arrives in properly BIG boxes !!
Moxi

I do love stuff that arrives in properly BIG boxes !!
Moxi
Re: More Renewable Shenanigans at Stinsy Towers
What's the make and model??
I don't know why they don't make 'heat only' A/A models (just sell modified remote and smart controls for heaven's sake). Then there'd be no excuse for them to not to attract subsidies in the same way A/W do (and I like these far more than A/W).
I don't know why they don't make 'heat only' A/A models (just sell modified remote and smart controls for heaven's sake). Then there'd be no excuse for them to not to attract subsidies in the same way A/W do (and I like these far more than A/W).
Re: More Renewable Shenanigans at Stinsy Towers
Here is the spec label:


12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: More Renewable Shenanigans at Stinsy Towers
model numbers on the box G
moxi
moxi
Re: More Renewable Shenanigans at Stinsy Towers
Oh interesting. Not a make I'm familiar with. Can't wait to hear about progress.
-
- Posts: 1017
- Joined: Tue Jun 01, 2021 12:35 pm
Re: More Renewable Shenanigans at Stinsy Towers
Same name plate as Nowty’s ?