Octopus re-powering old wind turbines

#1

Post by dan_b »

https://renews.biz/79541/octopus-energy ... ring-plan/

I guess if the towers are already there, if you can get more power out of them as they come to end of life it's a good idea?
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1314
Joined: Mon Jun 14, 2021 1:17 pm

Re: Octopus re-powering old wind turbines

#2

Post by Mart »

Cheers, one of those stories that I just file under 'nice', as they put a nice smile on my face.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Octopus re-powering old wind turbines

#3

Post by Mr Gus »

Simple logic, ...well played octopus, renovation & rejuvenation 👍 ..that has got to be an efficient win, just what the doctor ordered.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
User avatar
Joeboy
Posts: 8154
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Octopus re-powering old wind turbines

#4

Post by Joeboy »

dan_b wrote: Mon Aug 01, 2022 5:22 pm https://renews.biz/79541/octopus-energy ... ring-plan/

I guess if the towers are already there, if you can get more power out of them as they come to end of life it's a good idea?
I'd invest in these. Absolutely 💯
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 2063
Joined: Wed Jun 02, 2021 6:10 pm

Re: Octopus re-powering old wind turbines

#5

Post by AE-NMidlands »

As long as it's the turbine (meaning gearbox and generator) which is obsolete or life-expired, and the tower isn't going to be overloaded by a bigger turbine...
I'm sure the engineers will have done their sums, and I'll also bet that the towers were over-engineered originally - in other words had a good margin of safety.
Even if they didn't, the failure of the odd one might be a price worth paying for the amount of resources and energy saved across the whole fleet...
Operational Research was vital to the UK surviving the 2nd world war, and I have no problem with it.
Just don't get me going on management accounting - or "Value Engineering" which I think I think are quite different things!
Last edited by AE-NMidlands on Mon Aug 01, 2022 9:38 pm, edited 1 time in total.
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Stig
Posts: 172
Joined: Tue Jun 15, 2021 9:08 am

Re: Octopus re-powering old wind turbines

#6

Post by Stig »

There's a load of old 2-bladed turbines by the A395 in Cornwall that have been sitting still for years, I wish someone would replace them. Even if they'd only take fairly low power turbines all the cabling and foundations are just sitting there doing nothing, makes me sad every time I go past them on the way to my Mother's place.
smegal
Posts: 290
Joined: Fri Apr 08, 2022 7:51 pm

Re: Octopus re-powering old wind turbines

#7

Post by smegal »

I have a feeling I know what they have planned. Apparently you can repower an existing receiving the fit, turbine and still get the original fit. So you could replace a 250 kW 2 bladed turbine with a 54m 3 bladed derated to 250 kW (or rated at 500 kW but only claiming 50% of the generation against fit). The new turbine will generate significantly more than the older unit.

https://www.ofgem.gov.uk/publications/f ... -equipment
User avatar
Stinsy
Posts: 2890
Joined: Wed Jun 02, 2021 1:09 pm

Re: Octopus re-powering old wind turbines

#8

Post by Stinsy »

Could you do this with solar?

Replace an old 4kWp array with 6kWp and only claim FiT payments on 2/3rds of the generation?
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
User avatar
Joeboy
Posts: 8154
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Octopus re-powering old wind turbines

#9

Post by Joeboy »

Stinsy wrote: Thu Aug 04, 2022 7:31 am Could you do this with solar?

Replace an old 4kWp array with 6kWp and only claim FiT payments on 2/3rds of the generation?
That is a great idea. I thought most connections were limited to the 3.68kW inverter output to grid? It would be great if people could simply retro fit 50% more for self use.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5833
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus re-powering old wind turbines

#10

Post by nowty »

Stinsy wrote: Thu Aug 04, 2022 7:31 am Could you do this with solar?

Replace an old 4kWp array with 6kWp and only claim FiT payments on 2/3rds of the generation?
I believe you can, there was some info about it in a FIT consultation or a FIT annual report, I'll try and find the info later. But its one of those things were FIT providers don't want to know and try and fob you off. Similar to DNO's, you need to speak to the right person.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3