HPC
Re: HPC
I like the bit where they mention that Framatome helped to build Sizewell B, leaving out the project over run and sky rocketing price of that project even though it was based on the much better understood PWR design.
They also failed to mention the number of times Framatome has come close to going bust and the illegal bail outs the company received from the French state despite EU rules on this
That said its always quite impressive to me that such a small vessel sits at the heart of the immense structure of a nuclear power station and pumps out 1600MW (thermal).
Moxi
They also failed to mention the number of times Framatome has come close to going bust and the illegal bail outs the company received from the French state despite EU rules on this
That said its always quite impressive to me that such a small vessel sits at the heart of the immense structure of a nuclear power station and pumps out 1600MW (thermal).
Moxi
-
- Posts: 984
- Joined: Tue Jun 01, 2021 12:35 pm
Re: HPC
Size of the pressure vessel surprised me too
-
- Posts: 1873
- Joined: Thu Sep 09, 2021 3:42 pm
- Location: North East Dorset
Re: HPC
Try walking past the reactor compartment in a nuclear boat, that really does drive home how small a PWR can be. The one time I was on a boat (doing acceptance trials) I found being sat in the wardroom, just a few feet from the reactor compartment, just a little bit unnerving. Amused me that they put the officers closest to the reactor, then the senior rates a bit further away, with the junior rates about as far from the reactor as you can get.
25 off 250W Perlight solar panels, installed 2014, with a 6kW PowerOne inverter, about 6,000kWh/year generated
6 off Pylontech US3000C batteries, with a Sofar ME3000SP inverter
6 off Pylontech US3000C batteries, with a Sofar ME3000SP inverter
Re: HPC
Yeah, it's remarkably small considering how much thermal power it generates, but also considering how big the actual final civil site at Hinkley C is - it's gigantic, markedly larger than any other nuclear site in the UK in terms of acres covered. Assume it's all the additional containment, coolant and back-up generation requirements for this generation of plant?
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
-
- Posts: 984
- Joined: Tue Jun 01, 2021 12:35 pm
Re: HPC
When we flew into Bristol a few weeks back, we banked over Hinkley Point - the site is huge, seemingly dwarfing A & B.
The scale of the construction site & equipment was staggering.
The scale of the construction site & equipment was staggering.
Re: HPC
Not sure about that, it’s a big site for sure and there are other works that are part of it externally such as a large park and ride site from the M5 at Bridgwater, but here is a satellite view.. Looks nearly 4x the size but it will shrink again once construction offices are removed.