07/03/23 18:00 LOLP forecast
56.2855500%
Expected GB generation is currently less than demand by -115.9MW (negative derated margin)
I guess they will stick on West Burton 1 coal and Drax 5 & 6.
High loss of load probability forecast
Re: High loss of load probability forecast
I see they are currently exporting 2.3GW to France and Ireland, wouldn't they want to reduce these first?
16 x 230W Upsolar panels S Devon, 4kW Steca, 3.9 MWh FITs/yr
8 x 405W Longi panels, 250/60 MPPT, 3.3 MWh/yr
Victron MultiPlus II-GX 48/5000/70-50
10.65 kWh Pylontec Force-L2
zappi 7kW EVCS
Villavent whole-house MVHR
5000l rainwater system
Vaillant 12kW HP
8 x 405W Longi panels, 250/60 MPPT, 3.3 MWh/yr
Victron MultiPlus II-GX 48/5000/70-50
10.65 kWh Pylontec Force-L2
zappi 7kW EVCS
Villavent whole-house MVHR
5000l rainwater system
Vaillant 12kW HP
-
- Posts: 563
- Joined: Sun Jul 18, 2021 11:50 am
-
- Posts: 563
- Joined: Sun Jul 18, 2021 11:50 am
Re: High loss of load probability forecast
Outturn imbalance prices hit £1950/MWh over the evening peak.
3.61 GW of wind. 22.67 GW gas. 1.74 GW coal.
Hopefully this illustrates that wind power is not the same value as power from a fuel, just like random Ubers isn't the same usefulness as regular Uber.
3.61 GW of wind. 22.67 GW gas. 1.74 GW coal.
Hopefully this illustrates that wind power is not the same value as power from a fuel, just like random Ubers isn't the same usefulness as regular Uber.
Re: High loss of load probability forecast
Biggest constituent is transfers to/from France, it went from -4 to +2.5 GW during the course of the day, completely dwarfs the contribution from coal useful though that is. I am surprised given the state of their nukes they can spare it.
16 x 230W Upsolar panels S Devon, 4kW Steca, 3.9 MWh FITs/yr
8 x 405W Longi panels, 250/60 MPPT, 3.3 MWh/yr
Victron MultiPlus II-GX 48/5000/70-50
10.65 kWh Pylontec Force-L2
zappi 7kW EVCS
Villavent whole-house MVHR
5000l rainwater system
Vaillant 12kW HP
8 x 405W Longi panels, 250/60 MPPT, 3.3 MWh/yr
Victron MultiPlus II-GX 48/5000/70-50
10.65 kWh Pylontec Force-L2
zappi 7kW EVCS
Villavent whole-house MVHR
5000l rainwater system
Vaillant 12kW HP
Re: High loss of load probability forecast
Also true.
EU grid not really at its best!
EU grid not really at its best!