G99 Comissioning forms and schematic
G99 Comissioning forms and schematic
My additional system is installed, and now I need to complete this form and send in a schematic etc.
Hopefully I have the correct form, my system has an existing 3.68kw system installed in 2015, and my new Victron system (PV with DC battery) installed recently.
Presumably I need to list both systems on that form, as I did for the G99 application last year?
On page 3 under information to be enclosed it states "As installed Standard Application Form data, unless already provided", what is this?
Do I need to fill out part 2?
Hopefully I have the correct form, my system has an existing 3.68kw system installed in 2015, and my new Victron system (PV with DC battery) installed recently.
Presumably I need to list both systems on that form, as I did for the G99 application last year?
On page 3 under information to be enclosed it states "As installed Standard Application Form data, unless already provided", what is this?
Do I need to fill out part 2?
Re: G99 Comissioning forms and schematic
I've drawn my system schematic for the DNO, anything I've left off or any problems?
Link for bigger picture.
Link for bigger picture.
Re: G99 Comissioning forms and schematic
Hello
Is there an Earth connection on your
Generation Meter. Utility Meter and Energy Meter. ?
Is there an Earth connection on your
Generation Meter. Utility Meter and Energy Meter. ?
Re: G99 Comissioning forms and schematic
Hello
Is there an Earth connection on your
Generation Meter. Utility Meter and Energy Meter. ?
Is there an Earth connection on your
Generation Meter. Utility Meter and Energy Meter. ?
Re: G99 Comissioning forms and schematic
If they were being picky they might want to see an RCD protecting the Quattro, not a fused switch, as mandated by the IET CoP.
Otherwise it looks a very neat and comprehensive job to judge by yr pix in the other thread.
Otherwise it looks a very neat and comprehensive job to judge by yr pix in the other thread.
16 x 230W Upsolar panels S Devon, 4kW Steca, 3.9 MWh FITs/yr
8 x 405W Longi panels, 250/60 MPPT, 3.3 MWh/yr
Victron MultiPlus II-GX 48/5000/70-50
10.65 kWh Pylontec Force-L2
zappi 7kW EVCS
Villavent whole-house MVHR
5000l rainwater system
Vaillant 12kW HP
8 x 405W Longi panels, 250/60 MPPT, 3.3 MWh/yr
Victron MultiPlus II-GX 48/5000/70-50
10.65 kWh Pylontec Force-L2
zappi 7kW EVCS
Villavent whole-house MVHR
5000l rainwater system
Vaillant 12kW HP
-
- Posts: 572
- Joined: Sun Jul 18, 2021 11:50 am
Re: G99 Comissioning forms and schematic
Looking at your emergency Inverter bypass and the two three position changeover switches it would appear that you could connect the output from the Quattro to the grid, which if that output is not grid tied would be a problem. There are no notes on the sketch to explain which connection on the quattro is being used in that part of the sketch.
Re: G99 Comissioning forms and schematic
There is an earth in the generation meter, but I'm pretty certain its just looped into a terminal block, when the E112 was fitted an earth was taken from this terminal block to the earth terminal in the metal housing that the E112 is installed in, I've altered the drawing to reflect this.ALAN/ALAN D wrote: ↑Fri Mar 10, 2023 9:49 am Is there an Earth connection on your
Generation Meter. Utility Meter and Energy Meter. ?
No, the utility meter doesn't have an earth, I'd checked a photo of it when I did the drawing and it looked like an earth went in to it, but it actually runs up the side, do I've deleted that, thanks.
Thanks, for whatever reason the electricians didn't install one, but if the DNO are picky then I can get one fitted.
Thanks, I'll update the drawing to show which connections are being used. My understanding is that there is no possibility of feeding the grid from AC Out 1, the electricians who installed the AC side of the install checked it, and were happy with it. Perhaps I'll also change that part of the drawing to make it clearer.Countrypaul wrote: ↑Fri Mar 10, 2023 5:02 pm Looking at your emergency Inverter bypass and the two three position changeover switches it would appear that you could connect the output from the Quattro to the grid, which if that output is not grid tied would be a problem. There are no notes on the sketch to explain which connection on the quattro is being used in that part of the sketch.
Re: G99 Comissioning forms and schematic
Visio Professional, keys available online at a very reasonable prices.
First time I've ever used it, probably taken me just over a week, but only doing bits of an evening. I did cheat a little, the battery and solar panels were lifted from a friends drawing, but still needed a little alteration. I've been collecting schematics for a while, so I referred to them to get the gist of what was required. Also watched some YouTube videos on how to use Visio.
First time I've ever used it, probably taken me just over a week, but only doing bits of an evening. I did cheat a little, the battery and solar panels were lifted from a friends drawing, but still needed a little alteration. I've been collecting schematics for a while, so I referred to them to get the gist of what was required. Also watched some YouTube videos on how to use Visio.