Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2391

Post by Joeboy »

I'd say that turbines still humped going on the Ripple production graph and current wind speed?

:evil: Fucken donkeys, craick the fuck on and sort it. Keep Johnny wan spanner the fuck away next time for maintenance. That prick should be jottered. :lol: :lol: (Sorry, went backwards through time there). Oh no, it's OK Johnny, just your learning curve. Oh don't worry.... :roll:
8-)
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2392

Post by Joeboy »

Apparently a valve was replaced yesterday but there are now cooling issues. :(

Sods law, they never seem to hit 'issues' days when the wind is low,is that just me? :D
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5580
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2393

Post by nowty »

The service team (aka Johnny wan spanner) is officially back on site. ;)

Last edited by nowty on Wed Mar 22, 2023 11:39 am, edited 1 time in total.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2394

Post by Mr Gus »

Oh nowty that is so on point for years 2020 - as yet unknown end date! 😂

Maybe that's the tack that should be taken with vw bev supply.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2395

Post by Joeboy »

nowty wrote: Wed Mar 22, 2023 10:50 am The service team (aka Johnny wan spanner) is officially back on site. ;)

Ahahahahahah! :twisted: :lol: :lol: :lol: 8-)
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2396

Post by Joeboy »

First output now. Must have opened the valve they replaced yesterday and so allowing the cooler to work? :lol:
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2397

Post by Joeboy »

Suddenly project 3 doesn't look like such a bad bet...
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2398

Post by Mr Gus »

Ask the question joe.
" is this normal downtime for a turbine of this type or is it exceedi g the norm, if so by how much & what is the manufacturer s empirical data for this in year one - five"
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
User avatar
nowty
Posts: 5580
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2399

Post by nowty »

Mr Gus wrote: Wed Mar 22, 2023 10:34 pm Ask the question joe.
" is this normal downtime for a turbine of this type or is it exceedi g the norm, if so by how much & what is the manufacturer s empirical data for this in year one - five"
I tried to look up this type of data last week after the grid outage and came up with about 97% turbine availability for a modern turbine. This excludes external factors such as the grid being down. So thats about 11 annual days downtime. Your probably going to get about 5 or 6 days outage with just regular servicing so that leaves another 5 or 6 days out because of actual breakdowns.

Some of the early shutdowns were grid related (high voltage) which mysteriously went away and the one last week was also grid related.

I have not been keeping a tally of the actual turbine breakdowns, its at least the normal 5 or 6 days out, but I doubt its more than 10 days. And we are now into the second year so maybe we cannot grumble too much yet.

I've copied the info of outages below from what I can find from the dashboard for the outages,

Turbine output
05/04/2022
You might have noticed the generation from the turbine dropping off at some points. We're aware of the issue. The grid company is sending a signal to the turbine to stop at certain points. We're working with them to resolve the issue.


Data feed + 500 hours service
05/04/2022
The Operations and Maintenance team have been on site today doing the 500 hours service check, testing the torque on every bolt and doing a very thorough job. They have confirmed that the turbine has been generating today and will reboot the router to get the comm's back online tomorrow.


Turbine stopped for a service
21/04/2022
The turbine is stopped as the service team is on site working on it.


Blade inspection today
26/04/2022
The turbine is having its blades inspected today. It will be turned off whilst the inspection is taking place, so expect drops in generation at some points today.


Outage at Graig Fatha yesterday
12/05/2022
There was an outage at the wind farm yesterday. We are investigating the cause with the turbine manufacturer at the moment.


Maintenance crew is on site today at Graig Fatha
21/06/2022
A maintenance crew will be on site today checking the blade sensors. Your turbine will be switched off during this period. Wind speeds are forecasted to be a very low today which means very little/no loss to generation.


Maintenance at Graig Fatha today
07/07/2022
The turbine maintenance team are on site at Graig Fatha today doing some equipment testing. It shouldn't affect generation and today is forecast quite low wind speeds anyway.


Graig Fatha turbine is off
08/07/2022
Graig Fatha turbine is off due to a hydraulic oil level issue. Technicians have been informed and are scheduling a visit to fix it. Wind speeds are forecast to be low, so lost generation should be minimal.


Technicians on site today to resolve hydraulic oil level
11/07/2022
Technicians have been on site today to review the hydraulic oil level issue. We expect this to be resolved today. For further context, wind turbine maintenance of this kind is very much anticipatory. Graig Fatha’s sensors are continually running checks to ensure any issues can be addressed before they cause a problem. Oil levels tend to drop when it is not very windy (as it has been recently). This is normal. We don’t want to run the turbine when the oil levels are too low as this could cause damage. By doing this work now it keeps the turbine running optimally. But it does mean that the turbine has needed to be switched off. Very low wind speeds were already anticipated this month and were factored into members’ assumed generation/savings at this time of year. So this recent switch off has meant minimal disruption for members.


Service team at Graig Fatha today
01/08/2022
There will be a service team on site at Graig Fatha today. There may be some turbine stoppages while they check equipment.


Graig Fatha off today
05/09/2022
There is an issue with the turbine's pitch system. It couldn't be resolved remotely, so the maintenance team will need to visit and investigate. It may not be until tomorrow that the team get to site, so the turbine is likely to be off for all of today.


Graig Fatha off for maintenance
10/11/2022
The maintenance crew is at Graig Fatha today and tomorrow to carry out regular 6 monthly checks. They timed the check it on the basis tomorrow is forecast to be fairly low wind speeds, so minimising losses, despite today being quite windy.


Graig Fatha 6 monthly check up 21st-23rd Feb
21/02/2023
Your Graig Fatha turbine will be having its 6 monthly check up from Tuesday 21 Feb to Thursday 23rd. The maintenance team have tried to time it to coincide with low winds as far as possible and will endeavour to keep downtime to a minimum.


Graig Fatha - off line for 2 days for grid works
13/03/2023
There are grid works happening near Graig Fatha so the turbine won't be able to export for a couple of days. We will update you as soon as we get any further information. Apologies for the earlier message which said the grid works were complete - there was a miscommunication our end.


Hydraulics issue
20/03/2023
The hydraulics at Graig Fatha have been playing up during the last few days. We were in touch with the turbine operator over the weekend to keep it operating as much as possible and a service team are due to be on site today.



Graig Fatha resumed generation
22/03/2023
The service team were at the turbine again this morning and it has now resumed generation following maintenance on the cooling system.


Service team on site today
23/03/2023
Unfortunately a further hydraulic issue has been detected and the service team will be onsite today to investigate. We will update as soon as we know more.
Last edited by nowty on Thu Mar 23, 2023 10:17 am, edited 1 time in total.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2400

Post by Mr Gus »

Cheers for that nowty, niice bit o charting.

Consistency of data in coming months & years will tell us much.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Post Reply