New Rotary Dryer Install

User avatar
nowty
Posts: 5828
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

New Rotary Dryer Install

#1

Post by nowty »

I guess its greener drying clothes outside on a line of sorts than in a tumble dryer.

The old one had lasted over 10 years but was wearing out, a few lines had broke or stretched and a handle to raise it had recently broken off with little chance of finding a replacement. The old one fits into a plastic socket which I concreted in and I was hoping a new one would fit within it as I bought the same brand.

Of course it doesn't and to make matters worse the new one is not as tall, to SWMBO serious displeasure. In fact it was non negotiable. :evil:

OK I could maybe lift up the new socket into a concrete pillar off the floor to give it more height. Luckily I already had all the stuff necessary, some very old cement, sharpsand, masonry screws and some scrap wood. Decided to do it the lazy way and fit a block onto the top of the old one.

Image

Image

Image

I'll see tomorrow if the old cement still works. :roll:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Stinsy
Posts: 2885
Joined: Wed Jun 02, 2021 1:09 pm

Re: New Rotary Dryer Install

#2

Post by Stinsy »

nowty wrote: Mon Mar 27, 2023 11:59 pm
Image
Do I recognise that block from an earlier project?
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Moxi
Posts: 2293
Joined: Sun Oct 31, 2021 3:46 pm

Re: New Rotary Dryer Install

#3

Post by Moxi »

Thats no block its one of those new fangled thermal mass storage heaters!

:lol:

They are so posh at Nowty power stations that they don't use mere blocks!, repair, re-use, put it in the shed because it will come in helpful one day, recycle.


Moxi
User avatar
nowty
Posts: 5828
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: New Rotary Dryer Install

#4

Post by nowty »

Stinsy wrote: Tue Mar 28, 2023 7:24 am
nowty wrote: Mon Mar 27, 2023 11:59 pm
Image
Do I recognise that block from an earlier project?
Thank goodness its a much smaller project. :lol:
Image


Or do you mean the block paving brick, :D
Image


Most of which were reused here, :mrgreen:
Image
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
smegal
Posts: 290
Joined: Fri Apr 08, 2022 7:51 pm

Re: New Rotary Dryer Install

#5

Post by smegal »

nowty wrote: Tue Mar 28, 2023 1:41 pm
Stinsy wrote: Tue Mar 28, 2023 7:24 am
Do I recognise that block from an earlier project?
Thank goodness its a much smaller project. :lol:
Image



Do you have a thread with your culvert photo's on here? I'm working on a culvert screen project with a colleague, and was telling him about what you built. It'd be nice to show him the project. (we are NOT EA by the way!)
User avatar
nowty
Posts: 5828
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: New Rotary Dryer Install

#6

Post by nowty »

smegal wrote: Tue Mar 28, 2023 1:57 pm Do you have a thread with your culvert photo's on here? I'm working on a culvert screen project with a colleague, and was telling him about what you built. It'd be nice to show him the project. (we are NOT EA by the way!)
Not on here as it was at St Elsewhere, although there is a short summary of it here on another thread which includes the scariest picture of all time.
https://camelot-forum.co.uk/phpBB3/view ... t=10#p4852

The EA know about it and they even drove a remote pig through it only a few months back.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Stinsy
Posts: 2885
Joined: Wed Jun 02, 2021 1:09 pm

Re: New Rotary Dryer Install

#7

Post by Stinsy »

nowty wrote: Tue Mar 28, 2023 1:41 pm
Stinsy wrote: Tue Mar 28, 2023 7:24 am
nowty wrote: Mon Mar 27, 2023 11:59 pm
Image
Do I recognise that block from an earlier project?
Thank goodness its a much smaller project. :lol:
Image


Or do you mean the block paving brick, :D
Image


Most of which were reused here, :mrgreen:
Image
The brick looked to me like it'd been in the oven at some point...
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
User avatar
nowty
Posts: 5828
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: New Rotary Dryer Install

#8

Post by nowty »

Stinsy wrote: Tue Mar 28, 2023 3:26 pm The brick looked to me like it'd been in the oven at some point...
I still have one tray of block paving bricks left for the octopus saving sessions. ;)
Image
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
smegal
Posts: 290
Joined: Fri Apr 08, 2022 7:51 pm

Re: New Rotary Dryer Install

#9

Post by smegal »

nowty wrote: Tue Mar 28, 2023 2:59 pm
smegal wrote: Tue Mar 28, 2023 1:57 pm Do you have a thread with your culvert photo's on here? I'm working on a culvert screen project with a colleague, and was telling him about what you built. It'd be nice to show him the project. (we are NOT EA by the way!)
Not on here as it was at St Elsewhere, although there is a short summary of it here on another thread which includes the scariest picture of all time.
https://camelot-forum.co.uk/phpBB3/view ... t=10#p4852

The EA know about it and they even drove a remote pig through it only a few months back.
Thank you for posting that! I had a browse through your posts, but didn't find that one.

It'd be interesting to see if your pipes make it on to the culvert inspection report.
User avatar
nowty
Posts: 5828
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: New Rotary Dryer Install

#10

Post by nowty »

The block looks about right although the concrete is still a bit soft in places, so I'll leave it about another week for it to harden off.

Image


I slotted the dryer in briefly, looks like its going to pass the SWMBO height test now. :D
Image
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Post Reply