Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
Adokforme
Posts: 621
Joined: Sun Sep 19, 2021 10:09 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2471

Post by Adokforme »

AE-NMidlands wrote: Sun Apr 02, 2023 9:33 am
Adokforme wrote: Sat Apr 01, 2023 11:06 am Just checking mine then similar here too, the difference between mine and their's being 17.97 kWh's. Coincidentally the last days generation for us was 18.04 so just wonder if they wait for the official figure to come through for the last day before updating!
But, as AE said what a great return, in our case it will just about cover the months leccy bill. :mrgreen:
You are right - it exactly fits my situation . Maybe they copied a 30-day month into their payout cell on the spreadsheet? Do we need to ask them?
A
Nah, I'm just going to wait until the "Last update" is changed from 30/03/23 after which the monthly payout figure should also then be added to our Octopus account. I believe they've stated previously they are dependent upon the official figures arriving with them before payment can be confirmed.
User avatar
Fintray
Posts: 1558
Joined: Mon May 31, 2021 6:37 pm
Location: Aberdeenshire

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2472

Post by Fintray »

Update is showing 02/04/23 and March figure has been amended.
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
User avatar
nowty
Posts: 5786
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2473

Post by nowty »

Time for the monthly capacity factor graph for GF, we now have the first full year of whole month operation.

CF for March was 26.7%, way down on baseline but we did lose several very good days due to grid outage and breakdown(s).

Ignoring the first partial month, the full 12 months CF was 27.18% verses the baseline of 30.5%.

Image
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Fintray
Posts: 1558
Joined: Mon May 31, 2021 6:37 pm
Location: Aberdeenshire

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2474

Post by Fintray »

Just in from Ripple:

We're pleased to announce that as a Kirk Hill member, you can now join the waiting list for additional Kirk Hill shares.

The waiting list allows members to purchase available shares in the project. There is currently a small number of Kirk Hill shares available due to some members not making all their instalments. If you are currently under your 120% ownership limit, we invite you to come forward if you wish to increase your ownership in Kirk Hill.

The waiting list works on a first come, first served basis. You'll be added to the waiting list once you have completed the steps below. Shares will be offered to members in chronological order of when they joined the waiting list.
Join your Kirk Hill waiting list

Here's what you need to do:

Step 1: Click the link below and log in to your Ripple dashboard

Step 2: Click on the "My portfolio" tab in the left hand menu

Step 3: Scroll down until you see the waiting list panel and click "Join the waiting list"
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2475

Post by Mr Gus »

I just don't trust the competence of their operations to invest any more money.
(based on their lacklustre performance & approach to what has been encountered thus far, to simple problems & changes which is a shame),

No great confidence at this time. 👎
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
User avatar
nowty
Posts: 5786
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2476

Post by nowty »

I think I joined the KH waiting list far too late. :evil:

Looks like I'll be "all in" on project 3 instead. :mrgreen:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 8096
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2477

Post by Joeboy »

I am on the,KH list but will be passing on this offer. VPV badge required. :D
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 8096
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2478

Post by Joeboy »

Mr Gus wrote: Tue Apr 04, 2023 12:46 pm I just don't trust the competence of their operations to invest any more money.
(based on their lacklustre performance & approach to what has been encountered thus far, to simple problems & changes which is a shame),

No great confidence at this time. 👎
For perspective, I am 100kWh from my predicted annual generation. Its 2.5 weeks late from the anniversary and what with the year 1 start up issues that's not bad.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2479

Post by Mr Gus »

It's the standard of operational management not turbine estimates & kWh returned just to be clear.
Have a suspicion that it will remain that way, their pace is set by silence & slow / no change, very poor.

A firm " to do list" so at least you can see something regardless of time is not simply forgotten.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
User avatar
SafetyThird
Posts: 201
Joined: Wed Mar 23, 2022 11:32 am
Location: North Devon

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2480

Post by SafetyThird »

For those that didn't max out their ripple turbine investment, are you more inclined to put into the upcoming solar farm or take more of the remaining Kirk Hill option that's just been released?

I have 80% of my allowance in Kirk Hill and was aiming to put the remaining 40% (up to the allowed 120%) in the solar park but having just received the email with the option to up my buy in of Kirk hill, I'm now debating whether to spread the investment or just max out on wind.
6kw PV (24 x REC Solar AS REC 250PE)
Clausius 5-25kw GSHP
Luxpower Squirrel Pod
Pylontech 21kwh
Eddi Diverter
250l hot water tank with 2 immersions
2 x Woodwarm stoves
7 acres of old coppice woodland
Ripple Kirk Hill 3.8kw
Ripple Derril Water 3.963 kW
Post Reply