Scottish onshore windfarm to be repowered
Re: Scottish onshore windfarm to be repowered
There is definitely a 2nd hand market for wind turbines - there's a lot of tech in that hardware and if they can be sold on, they will be.
I think I remember a few years ago on the Abundance Investment platform a wind farm project which was using 2nd life turbines.
I think I remember a few years ago on the Abundance Investment platform a wind farm project which was using 2nd life turbines.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Scottish onshore windfarm to be repowered
I wish someone would replace the whole set of dead two-bladed turbines near Davidstow, it saddens me every time I pass them.
Re: Scottish onshore windfarm to be repowered
Great to hear Dan, makes inroads on the whole scenario of recyclability via re-purposing, there has been a lot of crap about the lack of ability to do so (blades etc) so this helps counter the anti renewables brigade all the more.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Re: Scottish onshore windfarm to be repowered
All very good news.
The grid is searching for dispatchable leccy whereby the farm can tender for fixed longer term contracts. Batteries of course help with curtailment and negative type prices.
So the farm may sell most of its production at short term rates but in the duck curve dip in the afternoon when prices do and will in the future drop very low they fill up the batts to export at peak time with peak payments.
There is rather a presumption being made that the present grid connection cannot cope and a new one will be needed but it could be that the voltage could just be doubled for eg and therefore only needing a new transformer, or the cable originally fitted was not at max capacity thinking there might be more development -who knows. At worst they would just lay an additional cable ?
If they did need new connection at least they can use the old one whilst waiting 15yrs??
Perhaps they dont even need to generate at max because at that time they could receive curtailment payments which are more lucrative than actually producing. They could even tender for reduction demand contracts which again will be valuable with too much sun and wind around in the future.
The grid is searching for dispatchable leccy whereby the farm can tender for fixed longer term contracts. Batteries of course help with curtailment and negative type prices.
So the farm may sell most of its production at short term rates but in the duck curve dip in the afternoon when prices do and will in the future drop very low they fill up the batts to export at peak time with peak payments.
There is rather a presumption being made that the present grid connection cannot cope and a new one will be needed but it could be that the voltage could just be doubled for eg and therefore only needing a new transformer, or the cable originally fitted was not at max capacity thinking there might be more development -who knows. At worst they would just lay an additional cable ?
If they did need new connection at least they can use the old one whilst waiting 15yrs??
Perhaps they dont even need to generate at max because at that time they could receive curtailment payments which are more lucrative than actually producing. They could even tender for reduction demand contracts which again will be valuable with too much sun and wind around in the future.
Last edited by Ken on Fri Jul 14, 2023 11:28 am, edited 2 times in total.
Re: Scottish onshore windfarm to be repowered
How does this tie in with inter country supply via HVDC interconnectors in terms of pricing & the bigger game in terms of investment payback, profitability? will be interesting to see real time analytics for energy dumps via battery storage into grid networks (whichever countries they may be)
Something that hasn't been mentioned, (again poor news piece) is the reduction of turbines on site would have as a nigh on certainty been necessary to accommodate the sweep of blades that have also massively increased compared to that of the old set up due to original spacings just not fitting the bill.
Need to see much more on this project for a better picture from all angles.
Where is the battery storage? (presumably it sits underneath, utilising some of what was installed previously, if so how much)? & how does battery addition change the visible landscape, presumably no longer able to walk amongst turbines & fencing as a deterrent erected, remote locations of windfarms how does that affect local fire service attendance & requirements put in place for potential electrical fires until this kit is more proven & more widely accepted societally, (never mind us & our views / shared knowledge) ..tbh I'm waiting for a " we never agreed to this" news piece when it all comes together.
Something that hasn't been mentioned, (again poor news piece) is the reduction of turbines on site would have as a nigh on certainty been necessary to accommodate the sweep of blades that have also massively increased compared to that of the old set up due to original spacings just not fitting the bill.
Need to see much more on this project for a better picture from all angles.
Where is the battery storage? (presumably it sits underneath, utilising some of what was installed previously, if so how much)? & how does battery addition change the visible landscape, presumably no longer able to walk amongst turbines & fencing as a deterrent erected, remote locations of windfarms how does that affect local fire service attendance & requirements put in place for potential electrical fires until this kit is more proven & more widely accepted societally, (never mind us & our views / shared knowledge) ..tbh I'm waiting for a " we never agreed to this" news piece when it all comes together.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Re: Scottish onshore windfarm to be repowered
All the info is here - all the planning applications, site plans, etc - if you've got an evening free and fancy wading through it all!
https://www.scottishpowerrenewables.com ... ering.aspx
https://www.scottishpowerrenewables.com ... ering.aspx
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Scottish onshore windfarm to be repowered
Bloody hell, thanks dan.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Re: Scottish onshore windfarm to be repowered
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
-
- Posts: 2063
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Scottish onshore windfarm to be repowered
I ws looking at the Ripple webbsite and found this (a bit late (Aug '22) but it seems relevant.) https://octopus.energy/blog/repowering- ... -turbines/ with
A
It seems that raising the tower is an integral part of it, but no mention of re-equippingthe actual generator?An illustration of an octopus extending a turbine blade... Preliminary sketch of the blade-lengthening process
The process to build any new energy generator can be long and difficult. Everything from upgrading the local networks to getting planning permission can take ages. It typically takes seven years for a new turbine projects to get fully operational. Actual construction can be completed in a year: most of the time is taken up by lengthy planning and grid connection processes.
Tuning up our existing turbines can take far less time. We already have the most spot on data for wind speeds on site and local topography. Consultations with the local community are far quicker because they've already had a turbine in their neighbourhood – we're just adjusting what's already there. Because a lot of the most time-consuming work is already done, we can get more green electrons down the wires in months, not years.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Scottish onshore windfarm to be repowered
The way I read it (plus other info elsewhere) is it takes many years to get a new wind farm (seven years), but even though we have to go through the whole planning process again and re-build most things.AE-NMidlands wrote: ↑Tue Jul 18, 2023 6:27 pm I ws looking at the Ripple webbsite and found this (a bit late (Aug '22) but it seems relevant.) https://octopus.energy/blog/repowering- ... -turbines/ withIt seems that raising the tower is an integral part of it, but no mention of re-equippingthe actual generator?An illustration of an octopus extending a turbine blade... Preliminary sketch of the blade-lengthening process
The process to build any new energy generator can be long and difficult. Everything from upgrading the local networks to getting planning permission can take ages. It typically takes seven years for a new turbine projects to get fully operational. Actual construction can be completed in a year: most of the time is taken up by lengthy planning and grid connection processes.
Tuning up our existing turbines can take far less time. We already have the most spot on data for wind speeds on site and local topography. Consultations with the local community are far quicker because they've already had a turbine in their neighbourhood – we're just adjusting what's already there. Because a lot of the most time-consuming work is already done, we can get more green electrons down the wires in months, not years.
A
1) The local grid access point is there as it was before, so minimal grid work required.
2) The locals already have been used to the old windfarm so far less hostile to a new one so far easier to get the planning permission.
I believe these two aspects are the longest and hardest to get an otherwise greenfield wind farm operational from the drawing board.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3