So we have just put down the deposit on our first EV. I am trying to get things moving on a wall box ASAP. We have a sparky who is happy to do the electrical side of things and I am trying to do everything else I can.
Filling in the DNO form and it needs to know "Maximum demand of new equipment" Think we will go for the 1-phase Zappi but can't see a precise spec as there are no instructions on the purchase page (as far as I can see)
Presuming it's 32 amp but can anyone with one confirm?
Thanks
Zappi installation question
Re: Zappi installation question
What EV have you gone for ?
Or just the battery capacity of it.
EDIT - Yeah 32A should do it on the form.
Or just the battery capacity of it.

EDIT - Yeah 32A should do it on the form.
19.6kW PV > 114MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Zappi installation question
Well, that was unexpected. Already got the go-ahead from the DNO 