HVDC Interconnectors

Any news worthy story. Good things to watch at the Cinema, Theatre, on TV or have you read a good book lately?
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#241

Post by dan_b »

A good article!

I used 12ft ladder to remove the paywall it’s worth a reas
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
Joeboy
Posts: 8293
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: HVDC Interconnectors

#242

Post by Joeboy »

I access these articles on my phone. No paywall. Only just realised the paywall issue on PC. :oops:
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 2086
Joined: Wed Jun 02, 2021 6:10 pm

Re: HVDC Interconnectors

#243

Post by AE-NMidlands »

Joeboy wrote: Sat Mar 16, 2024 7:57 am Long distance!
https://www.telegraph.co.uk/business/20 ... wer-cable/
Behind a paywall, but it doesn't look very clever to me... Iceland might have a big surplus of renewable energy (and is a lot closer,) but the USA?
I found "Renewables, including large hydropower, represented about 25% of electricity generated in the United States in the first half of 2023."
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Mart
Posts: 1337
Joined: Mon Jun 14, 2021 1:17 pm

Re: HVDC Interconnectors

#244

Post by Mart »

Hi Dan, bit surprised today to see lots of articles pointing to the 'launch' of Viking Link, including one from National Grid themselves. Eventually found an article that said NG 'officially inaugerates' Viking Link. Does this mean anything other than just a formal date for the books?

National Grid launches Viking Link, the next step towards a North Sea super-grid
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#245

Post by dan_b »

Semantics really; it marks the end of the testing and commissioning phase and the "official" completion of the project, even though it's been working just fine for a while.

Although only at half capacity for the time being due to grid constraints on the other side of the link!
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1337
Joined: Mon Jun 14, 2021 1:17 pm

Re: HVDC Interconnectors

#246

Post by Mart »

dan_b wrote: Fri Apr 19, 2024 4:10 pm Semantics really; it marks the end of the testing and commissioning phase and the "official" completion of the project, even though it's been working just fine for a while.

Although only at half capacity for the time being due to grid constraints on the other side of the link!
Thanks Dan, I assumed it was something like the end of commissioning, but found it strange not to see it said clearly anywhere.

But no complaints from me, it's all good news, and incredible to see how much our imports have been rising the last few years, largely due to cheaper leccy, and lower carbon generation in mainland Europe. Plus the issues with French nuclear a few years ago, skewing the results. Hoping to see ever more export of off-shore wind as the industry expands further.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
User avatar
Joeboy
Posts: 8293
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: HVDC Interconnectors

#247

Post by Joeboy »

15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#248

Post by dan_b »

Very!
Useful to be reminded of the impact of Brexit and our subsequent withdrawal from being tightly integrated into the EU energy market.
But the stuff about how this link effectively acts as an interlink into Germany was very interesting!
Joeboy wrote: Sat Apr 20, 2024 8:26 am Of interest?
https://montelgroup.com/updates-and-ins ... nd-profits
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2354
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#249

Post by dan_b »

Construction has started in Germany for their part of the Neuconnect 1.4GW HDVC interconnector

https://renews.biz/93329/neuconnect-con ... n-germany/

Interesting that this will connect to the UK Grid on the Isle of Grain - which is where the BritNed connection to The Netherlands already has its HVDC conversion and UK Grid connections. The Grid connection there must be pretty beefy.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Tinbum
Posts: 1149
Joined: Mon May 31, 2021 9:55 pm

Re: HVDC Interconnectors

#250

Post by Tinbum »

Not interconnectors but I saw yesterday that Draxe's battery storage construction seems to be progressing nicely. (drove past it yesterday).
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
Post Reply