Part ownership of a Ripple Wind Turbine, fancy it?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Has Kirk Hill data been down for 2 days or is it just mine?
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Yes it's down, see note on Ripple website.
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Data is down and if you’re with Eon then you won’t get paid till around September
because they have issues
Eon = always fast to raise the bill always sooooooo slow to pay you any money they might owe you.
What a shower !
Moxi

Eon = always fast to raise the bill always sooooooo slow to pay you any money they might owe you.
What a shower !
Moxi
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Thought of you lads today. Aberdeen bay windfarm and ships on stand by. Stunning weather today up here in both solar & wind forms.


15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Cracking view ! We have had wall to wall sunshine, house stack hovering around 90% car filled up to 82% on the granny charger and all house appliance batteries topped up. This is how summer should have been !
Haven’t even bothered getting all the panels out either today.
Moxi
Haven’t even bothered getting all the panels out either today.
Moxi
Re: Part ownership of a Ripple Wind Turbine, fancy it?
August capacity factor graphs for both GF and KH.
Both performed well significantly above baseline with GF 19% above and KH 41% above.


Both performed well significantly above baseline with GF 19% above and KH 41% above.



Last edited by nowty on Wed Sep 04, 2024 3:49 pm, edited 1 time in total.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Cheers @Nowty, that's good to learn.
Afraid I've a couple of questions arising if you wouldn't mind indulging me.
Is the Kirk Hill total still to have the final three missing day totals added?
And, is there a reason why one graph shows comparison to P75 while t'other is to P50?
Have to confess that when first coming across the P figures that I did find it confusing trying to understand why a P50 return was higher than a P75, but subsequently understand that it's purely a baseline figure likely to be met, at least either 50% or 75% of the time?
Happy to be advised otherwise if not the case.
Afraid I've a couple of questions arising if you wouldn't mind indulging me.
Is the Kirk Hill total still to have the final three missing day totals added?
And, is there a reason why one graph shows comparison to P75 while t'other is to P50?
Have to confess that when first coming across the P figures that I did find it confusing trying to understand why a P50 return was higher than a P75, but subsequently understand that it's purely a baseline figure likely to be met, at least either 50% or 75% of the time?
Happy to be advised otherwise if not the case.
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Very possibly the KH figures will be revised upwards, I'll edit it if they are.Adokforme wrote: ↑Sun Sep 01, 2024 9:27 pm Cheers @Nowty, that's good to learn.
Afraid I've a couple of questions arising if you wouldn't mind indulging me.
Is the Kirk Hill total still to have the final three missing day totals added?
And, is there a reason why one graph shows comparison to P75 while t'other is to P50?
Have to confess that when first coming across the P figures that I did find it confusing trying to understand why a P50 return was higher than a P75, but subsequently understand that it's purely a baseline figure likely to be met, at least either 50% or 75% of the time?
Happy to be advised otherwise if not the case.
The baselines are based upon what was in the respective share offers, in fact I keep thinking about changing the wording to "share offer baseline". I thought someone would bring it up sooner or later but at least that means someone actually reads this stuff. Normally you would base it on the P50 as that is the most likely outcome over time. P50 means that there is a 50% probability of at least meeting that generation, its a bit like tossing a coin as you have equal chance of getting it right or wrong.
KH was based upon the P50 estimate because they had two years of real wind speed data from the site.
GF was based upon the P75 estimate, that means the generation yield estimate was lower than the P50, your correct in that its confusing, but there is a higher probability of generating at least a lower amount. The reason why they chose the P75 estimate for the GF share offer was that they did not have any real measured wind data, it was all modelled on theoretical Met office data. Therefore there was more uncertainty and going for a P50 estimate would have been a bit naughty. In fact the actual GF share offer baseline is actually even slightly lower than the P75 as they also took off about another 2% (cant quite remember the exact figure) because of the location of the turbine which is down wind of many more wind turbines from the predominant west which will lower the wind power slightly and add unwanted turbulence.
The WB project which they are still trying to flog


GF is on the distribution network and normally does not have any curtailment, in addition it has embedded benefits (its near local use) and gets a lower transmission charge. If locational reform ever comes in (not likely now if gas prices remain low) it would also be in a better position compared to the Scottish wind farms.
KH is on both the distribution network and the transmission network. It has been made clear recently it will be curtailed at times (no compensation) and also will need to join the balancing mechanism in which it will be paid to switch off at times with compensation but the payments may be smaller than what it would have generated. Those payments would be paid to the Coop and go towards the operating costs but will not be paid as part of the Ripple rebates.
EDIT - KH is directly connected to the distribution network but there is a transmission transformer at Maypole which allows power to flow into the transmission network. I think because of this arrangement it pays a lower transmission charge than WB.
Last edited by nowty on Mon Sep 02, 2024 12:44 pm, edited 1 time in total.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Is there an explanation given why operating costs are to be doubled for WB?
I suppose investors in the management company will need a return?
Does anyone have an opinion of benefit of shares in WB compared to more PV on the roof?
And of more PV+battery compared to Octopus Intelligent Go for EV charging?
Also any opinions whether Keith might offer new inducements to get the 2050 obligation back on track?
I suppose investors in the management company will need a return?
Does anyone have an opinion of benefit of shares in WB compared to more PV on the roof?
And of more PV+battery compared to Octopus Intelligent Go for EV charging?
Also any opinions whether Keith might offer new inducements to get the 2050 obligation back on track?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
It appears to me that more PV and an export contract via mcs certification on at least part of the array removes most obstacles and stacks the account with cash for when there is no solar.kla456 wrote: ↑Mon Sep 02, 2024 10:39 am Is there an explanation given why operating costs are to be doubled for WB?
I suppose investors in the management company will need a return?
Does anyone have an opinion of benefit of shares in WB compared to more PV on the roof?
And of more PV+battery compared to Octopus Intelligent Go for EV charging?
Also any opinions whether Keith might offer new inducements to get the 2050 obligation back on track?
Although and to be transparent, I'm not as much of a fan of Ripple as i once was. Too many potential fault paths.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit