Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
User avatar
nowty
Posts: 5791
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#361

Post by nowty »

Joeboy wrote: Mon Nov 29, 2021 8:31 am Forecast remains good all day. I reckon up in the air for 10.30am. :D
And visibility is good too, one concern I had was fog.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
AE-NMidlands
Posts: 2030
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Wind Turbine, fancy it?

#362

Post by AE-NMidlands »

nowty wrote: Mon Nov 29, 2021 9:59 am
Joeboy wrote: Mon Nov 29, 2021 8:31 am Forecast remains good all day. I reckon up in the air for 10.30am. :D
And visibility is good too, one concern I had was fog.
Good, we need it asap: currently energynumbers showing 8GW wind, 21.7 gas and 2 coal!
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Adokforme
Posts: 621
Joined: Sun Sep 19, 2021 10:09 pm

Re: Part ownership of a Wind Turbine, fancy it?

#363

Post by Adokforme »

From information received yesterday I understand it takes eight hours to assemble the blades! Now I don't know if they assemble the blades to the hub at ground level and then lift the entire assembly to install onto the generator or whether the hub is attached first and then the blades seperately afterwards. I suspect it may be the former in order to access the fixings but I don't know.
Is anyone else better informed?
AE-NMidlands
Posts: 2030
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Wind Turbine, fancy it?

#364

Post by AE-NMidlands »

I have seen pictures of blades being raised 1 by 1 in a lifting frame which keeps them in the right orientation to be fixed to the hub. Don't know whether they turn the hub (unbalanced) to keep the same orientation, or lift the blades in different attitudes.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
AE-NMidlands
Posts: 2030
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Wind Turbine, fancy it?

#365

Post by AE-NMidlands »

AE-NMidlands wrote: Mon Nov 29, 2021 10:21 am I have seen pictures of blades being raised 1 by 1 in a lifting frame which keeps them in the right orientation to be fixed to the hub. Don't know whether they turn the hub (unbalanced) to keep the same orientation, or lift the blades in different attitudes.
A
I have also found which shows one being raised already assembled!
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Moxi
Posts: 2266
Joined: Sun Oct 31, 2021 3:46 pm

Re: Part ownership of a Wind Turbine, fancy it?

#366

Post by Moxi »

Post removed
Last edited by Moxi on Sun Mar 31, 2024 8:55 pm, edited 1 time in total.
User avatar
nowty
Posts: 5791
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#367

Post by nowty »

The day 4 video report from Ripple definitely says the rotor is being attached on the ground and the whole rotor assembly is lifted up together.

20 secs to 35 secs into the video.

18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 8096
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Wind Turbine, fancy it?

#368

Post by Joeboy »

:roll:
nowty wrote: Mon Nov 29, 2021 12:34 pm The day 4 video report from Ripple definitely says the rotor is being attached on the ground and the whole rotor assembly is lifted up together.

20 secs to 35 secs into the video.

Yep, it's still a hairy lift but at least they have the whole field to land it on if the wind picked up. Can't do that offshore on a 150 mtr+ dia lift. Well, not easily!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5791
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#369

Post by nowty »

New time lapse video from first 4 days,

18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 8096
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Wind Turbine, fancy it?

#370

Post by Joeboy »

'Graig Fatha Turbine Week 2 - The first blade is attached to the hub

12/2/2021
Now the weather has cleared up (a little!) down on site, work has started again on the turbine construction.

We're excited to share that the first blade has been connected to the hub. Blade two is being lifted onto the hub as we speak. We're hoping then all the blades will be lifted into position later today but this is still weather dependent. We will update members as soon as we hear more, we're as excited as you are to see the blades in position!'


Ya Dancer!!!!! :)
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Post Reply