Re: HPC - Nuclear output currently 2.67 GW

#131

Post by chris_n »

Adokforme wrote: Sat Nov 30, 2024 1:30 pm According to National Grid Live Nuclear output is 2.67 GW which is the lowest I've ever come across. The grid seems to be coping adequately all the same, it has me wondering just how low the figure needs to drop to before the "Must have a Nuclear baseline" argument has the wind taken out of it's sails!
Unbelievable that every Nuclear power station has at least one reactor offline for refuelling at the same time at this time of year. Could maybe do with some better planning! The reactors that are offline are also consuming nearly 100MW to keep them cool etc.
Living the dream in Austria.
Uk property 3.75kW PV linked to 3kW inverter.
User avatar
nowty
Posts: 5834
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: HPC - Nuclear output currently 2.67 GW

#132

Post by nowty »

chris_n wrote: Sat Nov 30, 2024 3:25 pm
Adokforme wrote: Sat Nov 30, 2024 1:30 pm According to National Grid Live Nuclear output is 2.67 GW which is the lowest I've ever come across. The grid seems to be coping adequately all the same, it has me wondering just how low the figure needs to drop to before the "Must have a Nuclear baseline" argument has the wind taken out of it's sails!
Unbelievable that every Nuclear power station has at least one reactor offline for refuelling at the same time at this time of year. Could maybe do with some better planning! The reactors that are offline are also consuming nearly 100MW to keep them cool etc.
I think its actually perfect planning cos every current outage is planned refuelling and coming back early Dec.

Its actually been even lower last year down to just over 2.0 GW mid Feb 2023.
https://camelot-forum.co.uk/phpBB3/view ... 594#p28594
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Bugtownboy
Posts: 974
Joined: Tue Jun 01, 2021 12:35 pm

Re: HPC

#133

Post by Bugtownboy »

dan_b
Posts: 2307
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#134

Post by dan_b »

Impressive engineering
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Moxi
Posts: 2298
Joined: Sun Oct 31, 2021 3:46 pm

Re: HPC

#135

Post by Moxi »

Thats just the "bin" that contains the "slow explosion" of a controlled nuclear reaction the clever stuff is the primary and secondary coolant circuits that keep the energy transfer in equilibrium. Lose that capacity and all sorts of things go wrong very quickly, especially in a hydraulic coolant circuit as opposed to a compressive coolant circuit.

On the previous generations of reactor the size of the reactor was much smaller and was able to be manufactured by many more of the heavy engineering companies around the world as well as forgemasters in the UK - thats maybe one of the stronger arguments for the SMR's that the supply chain is much larger because the net operating parameters are more manageable with regards to temperature and pressure.

Always nice to see a big chunk of steel though, thats sixty years operational then another 60 to 120 years in situ while the activated portions of the steel vessel decay back to manageable levels to allow it to be removed and cut up / reprocessed / buried.