I've still got the same cabling to my 6 Pylontechs, going with 2x25mm cable from inverter - 100A Jean Muller Disconnector - 2x25mm Pylontech cables - 6x3000C.


Obviously, with these cables still in place I'm still limited to max of 100A and cant use the full 5kW rate to the battery stack yet, and I've limited the charge/discharge rate in the new Sunsynk to 95A. I want to get these cables/disconnector changed to both handle more from the 5kW Sunsynk, but also prepare for swapping out the Pylontechs for 2 of the Seplos Mason DIY kits (https://www.fogstar.co.uk/collections/s ... e-a-bundle).
So, what the best way to do this and what do I need? I'm thinking I'll need to bump up to 2x35mm cables from inverter to the DC disconnector with new fuses (160A? - https://www.bimblesolar.com/index.php?r ... Yk_FaXfahK), 2x35mm to a connector block such as this - https://www.electrical2go.co.uk/70mm-1x ... gIGG_D_BwE, then 2 lots of 2x25mm or 1 lot of 2x35mm cables to the actual batteries?
Any tips or suggestions for best places for cables/fuses/connectors/crimps etc would be great.
