Interesting
https://www.itv.com/news/tyne-tees/2025 ... r-weardale
Geothermal lithium extraction plant to go ahead
Geothermal lithium extraction plant to go ahead
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
-
- Posts: 2195
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Geothermal lithium extraction plant to go ahead
That's good news... I wonder whether they will be able to make good use of the thermal resource too? There isn't much around it to sell the heat to!
Stanhope village is 3 or 4 km away, so I guess that laying a heat main would not be viable.
Stanhope village is 3 or 4 km away, so I guess that laying a heat main would not be viable.
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Geothermal lithium extraction plant to go ahead
Near me St Andrews Uni, installed a biomass boiler approx 5 miles away in the village of Guardbridge and pipe flow and return to various Uni buildings, I’m sure there will be a government grant to make it possible!