nowty wrote: ↑Thu Mar 21, 2024 12:01 pm
Its on and its double jeopardy with two 30 min sessions , 17:30 to 18:00 and 18:30 to 19:00 but low volume again at 75MW, so small payouts.
But I would imagine Octopus will pay out £1.75 again irrespective of what happens in the bidding, going off past form.
Those with very small battery capacity will be able to re-charge during 18:00 to 18:30.
Completed just in time for tomorrow’s webinar …….
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 240 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
nowty wrote: ↑Thu Mar 21, 2024 12:01 pm
Its on and its double jeopardy with two 30 min sessions , 17:30 to 18:00 and 18:30 to 19:00 but low volume again at 75MW, so small payouts.
But I would imagine Octopus will pay out £1.75 again irrespective of what happens in the bidding, going off past form.
Those with very small battery capacity will be able to re-charge during 18:00 to 18:30.
Completed just in time for tomorrow’s webinar …….
Yep, that will make the full 12 hour's worth of test sessions, so I don't expect any more this season.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
No invitation to join on my account yet, or an email. The 2nd March email came in at 1228 so there's time yet. Very grateful for the alert here, though.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Patience, the bidding process takes time.
And we might need to opt in a second time in the 18:00 to 18:30 lull period, hmmmm, seems engineered to catch folk out and reduce the cost.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Octopus stuck to their guns and bid £1.75 and were rejected, but I'm sure they will still play at £1.75, especially as its almost certainly the last session.
British Gas did not bid again probably as a protest.
The bids which were accepted ranged from 42.5p to 74.9p.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Looks like its "game over man" for this season, we might find out from tomorrows webinar what the future plans are for the Demand Flexibility Services.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3