Although this is not the first time I have shown this graph, to wet the appetites of WT2 members this is the monthly forecasted baseline capacity factors of both WT1 and WT2. Only the average over the year is in the share offer but I managed to get the more detailed info from Ripple.
WT2 (Kirk Hill) is a much windier place.
The price per watt was more for WT2 but the price per kWh's produced was less than WT1 because of the higher capacity factors. But WT2 being in Scotland may have some higher leccy transmission costs.
https://www.scotsman.com/news/politics/ ... er-3511578
And the new curveball is the Electricity Generator Levy which may also have a small effect on WT2.
WT2 (Kirk Hill) is a much windier place.
The price per watt was more for WT2 but the price per kWh's produced was less than WT1 because of the higher capacity factors. But WT2 being in Scotland may have some higher leccy transmission costs.
https://www.scotsman.com/news/politics/ ... er-3511578
And the new curveball is the Electricity Generator Levy which may also have a small effect on WT2.
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
It is going to be an interesting year, focused on Nov coming in on time. The politics (of dancing) not so much.nowty wrote: ↑Sat Jan 07, 2023 12:42 pm Although this is not the first time I have shown this graph, to wet the appetites of WT2 members this is the monthly forecasted baseline capacity factors of both WT1 and WT2. Only the average over the year is in the share offer but I managed to get the more detailed info from Ripple.
WT2 (Kirk Hill) is a much windier place.
The price per watt was more for WT2 but the price per kWh's produced was less than WT1 because of the higher capacity factors. But WT2 being in Scotland may have some higher leccy transmission costs.
https://www.scotsman.com/news/politics/ ... er-3511578
And the new curveball is the Electricity Generator Levy which may also have a small effect on WT2.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
How about as a renewables collective we give 5h1t constructively to various govt twonks & elected representative orifices?
Otherwise the likes of co-operative energy is one flush fro. being down the pan!
Otherwise the likes of co-operative energy is one flush fro. being down the pan!
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Septembers total will be passed today, mind-blowing! 8 days in!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Having a cuppa earlier and thinking on what a good run the turbine has been on... So I took production figure up to midnight last night divided by 7 then multiplied by 31. Holy jamoley! That's all I'm saying.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
-
- Posts: 2014
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Shhhh! You will spoil it, saying that!
(It does look as though we're not in for a calm spell for a week or so yet though.)
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I tried to keep it vague!AE-NMidlands wrote: ↑Sun Jan 08, 2023 12:32 pmShhhh! You will spoil it, saying that!
(It does look as though we're not in for a calm spell for a week or so yet though.)
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Like you guys I daren't even think about what the final figure might be, but as of midnight last night it had achieved a CF of 63.8%!Joeboy wrote: ↑Sun Jan 08, 2023 12:53 pmI tried to keep it vague!AE-NMidlands wrote: ↑Sun Jan 08, 2023 12:32 pmShhhh! You will spoil it, saying that!
(It does look as though we're not in for a calm spell for a week or so yet though.)
If it keeps this up for the remainder then it'll certainly help to boost the annual CF figure come March. Up to end Dec, but 24.09%.
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I’m coming late to this but it does look interesting. Have registered for WT3.
SMA Sunnyboy 3.6kw / 16*250w PV panels south facing (2014 FIT-era)
Re: Part ownership of a Ripple Wind Turbine, fancy it?
26% is pretty bad, does it not achieve better than that?