High altitude hydro
High altitude hydro
A hydro plant at 5000m? That's a long way up!
https://electrek.co/2023/03/16/this-hyd ... sea-level/
https://electrek.co/2023/03/16/this-hyd ... sea-level/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: High altitude hydro
2.2 GW.
EDIT - Also a capacity factor of 37.8 %.
EDIT - Also a capacity factor of 37.8 %.
Last edited by nowty on Sat Mar 18, 2023 5:10 pm, edited 1 time in total.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: High altitude hydro
Also it says it integrates solar and storage at the same site, which is interesting.
You'd think with such a high elevation they could make it into a really mahoosive pumped hydro scheme with a lower lake much lower down?
You'd think with such a high elevation they could make it into a really mahoosive pumped hydro scheme with a lower lake much lower down?
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: High altitude hydro
It's in the Tibetan plateau, so the available drop might be quite limited. It's also a very long way from anywhere with a high capacity factor, both making pumped storage harder. Probably not worth the aggrevation.
-
- Posts: 101
- Joined: Sun Jun 13, 2021 5:29 pm
Re: High altitude hydro
Altitude is fairly meaningless without knowing the head.
I visited the Grande Dixance dam a number of years ago which has a head of over 1800m. Is that still the highest in the world?
There must be some kind of practical limit to the pressure that can be managed on these projects. 1800m gives about 180 bar pressure or 540 tons per square meter. A bit of blue pipe won't cut it with these pressures!
I visited the Grande Dixance dam a number of years ago which has a head of over 1800m. Is that still the highest in the world?
There must be some kind of practical limit to the pressure that can be managed on these projects. 1800m gives about 180 bar pressure or 540 tons per square meter. A bit of blue pipe won't cut it with these pressures!
8kw solar
ETA log boiler
5ha woodland
MG5EV
ETA log boiler
5ha woodland
MG5EV
Re: High altitude hydro
From Wikipedia
The water travels down a long penstock from the Grande Dixence Dam before reaching the Bieudron Power Station 1,883 m down. The water spins three pelton turbines, generating a combined capacity of 1,269 MW.The power station was built between 1993 and 1998 at a cost of US$1.2 billion.
The Bieudron Power Station alone holds three world records, for the height of its head (1,883 m), the output of each Pelton turbine (3 × 423 MW) and the output per pole of the generators (35.7 MVA). It was taken out of service in December 2000 after the rupture of a penstock. The power station became partially operational in December 2009 and fully operational in 2010.
So two years after it was built, it was taken out of service for 9 years. Obviously a 1,883m head presents engineering challenges
There are two other power stations supplied from Grand Dixence. An old small one with a head of 1,745m and an intermediate sized pair which first goes to power station half way down and then to a second one at the bottom.
I visited the dam in 2015.
The water travels down a long penstock from the Grande Dixence Dam before reaching the Bieudron Power Station 1,883 m down. The water spins three pelton turbines, generating a combined capacity of 1,269 MW.The power station was built between 1993 and 1998 at a cost of US$1.2 billion.
The Bieudron Power Station alone holds three world records, for the height of its head (1,883 m), the output of each Pelton turbine (3 × 423 MW) and the output per pole of the generators (35.7 MVA). It was taken out of service in December 2000 after the rupture of a penstock. The power station became partially operational in December 2009 and fully operational in 2010.
So two years after it was built, it was taken out of service for 9 years. Obviously a 1,883m head presents engineering challenges
There are two other power stations supplied from Grand Dixence. An old small one with a head of 1,745m and an intermediate sized pair which first goes to power station half way down and then to a second one at the bottom.
I visited the dam in 2015.
Re: High altitude hydro
I'm surprised they state a penstock for holding back the static head ? I would expect that to be the realms of a specialist control valve like the larner johnson.
Moxi
Moxi
Re: High altitude hydro
The pressure pipe on a hydro scheme is called the penstock, as opposed to penstock valves.
One of the more interesting hydro valve arrangements is at Dinorwig with the rapid closing valves and surge shaft.
-
- Posts: 662
- Joined: Mon Mar 21, 2022 7:37 pm
Re: High altitude hydro
So that is what the smaller pond is half way down and south of Elidir Fach, to reduce the hammering effect when the valves close?
Morso S11
FIT
16 Sharp PV panels facing WSW 4kW
Solarmax 4200S inverter
Non FIT
3 Canadian solar DC coupled 1.75kW facing SSE
Storage
Growatt SPA3000TL BL inverter ac coupled
Growatt GBLI6532 6.5kWh lithium phosphate battery
FIT
16 Sharp PV panels facing WSW 4kW
Solarmax 4200S inverter
Non FIT
3 Canadian solar DC coupled 1.75kW facing SSE
Storage
Growatt SPA3000TL BL inverter ac coupled
Growatt GBLI6532 6.5kWh lithium phosphate battery
Re: High altitude hydro
I don't know the pond itself, but I'd assume so. I just searched YouTube and saw a video where the valves closed super fast.openspaceman wrote: ↑Tue Mar 21, 2023 6:07 pmSo that is what the smaller pond is half way down and south of Elidir Fach, to reduce the hammering effect when the valves close?