Mr Gus wrote: ↑Wed Jun 07, 2023 8:18 pm
Timeline (which I moaned for ages that it was lacking, which eventually got updated with more anticipated project milestones)...
October 2023
Grid connection communication works
December 2023
Connection protection works
Early 2024
Energisation and final commissioning of turbines
However, I think I remember seeing something somewhere that said earlier than 2024 for commissioning, unless I was completely mistaken.
Ah, truly I remember the angst of GF delays! I got into looking well down the road and going OHMMMMM, no joke. Now we are down the road and it's . Soon enough for all we KH'ers.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
Ripple have said they cannot commission without the grid connection.
Everything else looks ok, all foundations done, all turbine components delivered and stored at the port in Ayr. Roadworks enroute to site done and dry run completed with simulated load. So, finish off site roads, crane standing areas, deliver to site and assemble.
Last edited by nowty on Wed Jun 07, 2023 8:48 pm, edited 1 time in total.
18.7kW PV > 111MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
That's why i've kept some distance from the ripple thread for a few months, but last 2days found myself wanting a bit of info joe.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Ok, would I be right in thinking that it was cited as april 2024 & now the timeline is reflecting that adjustment announcement? ..is that where i'm confused / confusing?
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Mr Gus wrote: ↑Wed Jun 07, 2023 8:45 pm
Ok, would I be right in thinking that it was cited as april 2024 & now the timeline is reflecting that adjustment announcement? ..is that where i'm confused / confusing?
OK, let's play. KH 3rd March 24. Generating for us.
Anyone?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
Mr Gus wrote: ↑Wed Jun 07, 2023 8:45 pm
Ok, would I be right in thinking that it was cited as april 2024 & now the timeline is reflecting that adjustment announcement? ..is that where i'm confused / confusing?
The timeline completion date has been early 24 for months? Although I could easily have missed a bit of news?
Luckily by that time of year that's all low level indoor.work as it will be blowing a hoolie there!
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit