Outgoing Octopus

Yuff
Posts: 470
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Outgoing Octopus

#21

Post by Yuff »

Applied today.
I haven’t exported before is the g99 letter the dno authorisation letter?
They asked for the MCS cert no and dno authorisation evidence.
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
User avatar
nowty
Posts: 5760
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Outgoing Octopus

#22

Post by nowty »

Yuff wrote: Tue Oct 10, 2023 4:52 pm Applied today.
I haven’t exported before is the g99 letter the dno authorisation letter?
They asked for the MCS cert no and dno authorisation evidence.
Yes its the G98 / G99 or even an old G83 / G59 connection letter. I lost mine and had to email my DNO for another, not a problem, they came back to me within a couple of days with an email.

Octopus found that a lot of old historic installations were never DNO notified even though they had an MCS certificate. So when Octopus apply to the DNO for an export mpan number it gets refused if they have never been notified. So when Octopus apply to the DNO for an export mpan number it gets refused if they have never been notified. So they are now insisting on seeing the DNO letter up front.
Last edited by nowty on Tue Oct 10, 2023 9:30 pm, edited 1 time in total.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
NikoV6
Posts: 218
Joined: Thu Aug 11, 2022 6:42 am

Re: Outgoing Octopus

#23

Post by NikoV6 »

When my DNO confirmed G99 they asked if I wanted an export MPAN, so I said yes. Just waiting for that to come through, I hope it speeds the application with Octopus :roll:
14Kw Mitsubishi Ecodan ASHP
22 x JA Solar 455W Mono Perc Half Cell Silvers
Solis 8.0Kw 5G Dual MPPT Inverter
13.5Kw Tesla Powerwall
Zappi 2 Charger
iBoost
User avatar
nowty
Posts: 5760
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Outgoing Octopus

#24

Post by nowty »

NikoV6 wrote: Tue Oct 10, 2023 7:22 pm When my DNO confirmed G99 they asked if I wanted an export MPAN, so I said yes. Just waiting for that to come through, I hope it speeds the application with Octopus :roll:
On the online application, there is a line where you can give your export MPAN number if you already have one.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Yuff
Posts: 470
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Outgoing Octopus

#25

Post by Yuff »

I uploaded the G99 certificate and the MCS certificate number was found on the octopus application page when I added it.
Hopefully it will all go through smoothly which is better than my Scottish power application in May, to export, that just never loaded on their website and there is no way to chase it up.
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
NikoV6
Posts: 218
Joined: Thu Aug 11, 2022 6:42 am

Re: Outgoing Octopus

#26

Post by NikoV6 »

nowty wrote: Tue Oct 10, 2023 7:34 pm
NikoV6 wrote: Tue Oct 10, 2023 7:22 pm When my DNO confirmed G99 they asked if I wanted an export MPAN, so I said yes. Just waiting for that to come through, I hope it speeds the application with Octopus :roll:
On the online application, there is a line where you can give your export MPAN number if you already have one.
👍👍
14Kw Mitsubishi Ecodan ASHP
22 x JA Solar 455W Mono Perc Half Cell Silvers
Solis 8.0Kw 5G Dual MPPT Inverter
13.5Kw Tesla Powerwall
Zappi 2 Charger
iBoost
Yuff
Posts: 470
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Outgoing Octopus

#27

Post by Yuff »

Applied on Tuesday, as an existing octopus customer, and received this today 🤔


Image
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
Yuff
Posts: 470
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Outgoing Octopus

#28

Post by Yuff »

Noticed this yesterday on our account


Image
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
User avatar
nowty
Posts: 5760
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Outgoing Octopus

#29

Post by nowty »

Yuff wrote: Mon Oct 16, 2023 6:46 am Noticed this yesterday on our account


Image
Your ahead of me, mine still shows “receiving half hour readings”, which is no change at all. :evil:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Fintray
Posts: 1539
Joined: Mon May 31, 2021 6:37 pm
Location: Aberdeenshire

Re: Outgoing Octopus

#30

Post by Fintray »

Since fitting a Ohme Home Pro charger I tried to change from Flux to Intelligent Octopus but when I tried to do it as an existing customer it came up with
Image
but entering exactly the same information as a new customer comes up with
Image

Have emailed them to sort out but has anyone else had this?
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Post Reply