Part ownership of a Ripple Wind Turbine, fancy it?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Great to hear that cabling is complete on T1. They seem to be gaining momentum now.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Having invested in Kirk Hill and a small investment in Derril Water and a £25 bribe for project 4 (not yet announced) i find myself 2 mths from completing the mthly payments.
After this i shall be approx £100/mth better off but feel i should continue to invest/support renewable projects.........
Does anyone know of a community project that may provide a return or benefit to me ??
Apologies if this appears a selfish post but i have a large mortgage /a house requiring much work and am not a charity but believe my heart is in the right place .....
George
After this i shall be approx £100/mth better off but feel i should continue to invest/support renewable projects.........
Does anyone know of a community project that may provide a return or benefit to me ??
Apologies if this appears a selfish post but i have a large mortgage /a house requiring much work and am not a charity but believe my heart is in the right place .....
George
1750w Vertical PV micro inverters
3800w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
3800w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
-
- Posts: 2073
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Part ownership of a Ripple Wind Turbine, fancy it?
https://www.congletonhydro.co.uk/congle ... fer-opens/ ?
or something from https://communityenergyengland.org/pages/share-offers ?
Can't put it in an ISA though, so you might well end up paying 20% tax on the interest - no matter what Ripple say! (You don't have to have very much in half a dozen of these to get up to the savings interest threshold!)
Triodos currently have something in an IFISA, I think, although it might not be pure energy.
A
or something from https://communityenergyengland.org/pages/share-offers ?
Can't put it in an ISA though, so you might well end up paying 20% tax on the interest - no matter what Ripple say! (You don't have to have very much in half a dozen of these to get up to the savings interest threshold!)
Triodos currently have something in an IFISA, I think, although it might not be pure energy.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I thought I'd pull together the timeline so far on the turbine builds what with it being the halfway mark and all that.
O7/09/23 All gear onsite & T1 build started.
14/09/23 T1 up.(7 days)
15/09/23,crane moving to T2.
05/10/23 T2 up. (20 days)
06/10/23 crane moving to T3.
????? Crane breaks @ T3, back up crane brought in.
17/10/23 T7 up. (11 days)
?????? Crane repairs @ T3
25/10/23 T3 up. (8 days).
50 days to get to 1/2 way mark incl a couple of legit named storms and a crane breakdown. That's around 12th Dec projecting out for all 8 to be up. I think that's excellent progress so far. . They'll.be needing zero hoods soon though!
O7/09/23 All gear onsite & T1 build started.
14/09/23 T1 up.(7 days)
15/09/23,crane moving to T2.
05/10/23 T2 up. (20 days)
06/10/23 crane moving to T3.
????? Crane breaks @ T3, back up crane brought in.
17/10/23 T7 up. (11 days)
?????? Crane repairs @ T3
25/10/23 T3 up. (8 days).
50 days to get to 1/2 way mark incl a couple of legit named storms and a crane breakdown. That's around 12th Dec projecting out for all 8 to be up. I think that's excellent progress so far. . They'll.be needing zero hoods soon though!
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Thanks for putting that together Joe, it's great they've made such progress given the circumstances.Joeboy wrote: ↑Sun Oct 29, 2023 11:37 am I thought I'd pull together the timeline so far on the turbine builds what with it being the halfway mark and all that.
O7/09/23 All gear onsite & T1 build started.
14/09/23 T1 up.(7 days)
15/09/23,crane moving to T2.
05/10/23 T2 up. (20 days)
06/10/23 crane moving to T3.
????? Crane breaks @ T3, back up crane brought in.
17/10/23 T7 up. (11 days)
?????? Crane repairs @ T3
25/10/23 T3 up. (8 days).
50 days to get to 1/2 way mark incl a couple of legit named storms and a crane breakdown. That's around 12th Dec projecting out for all 8 to be up. I think that's excellent progress so far. . They'll.be needing zero hoods soon though!
While that's been happening GF has been winding up the generation figures, albeit without the mammoth return of July, but finance wise, sufficient to surpass all the remainder. It's return alone for October showing our energy bill for the month a clean pair of heels.
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I looked today and I'd say Nov is going to start off well for GF. Up we go!Adokforme wrote: ↑Sun Oct 29, 2023 2:16 pmThanks for putting that together Joe, it's great they've made such progress given the circumstances.Joeboy wrote: ↑Sun Oct 29, 2023 11:37 am I thought I'd pull together the timeline so far on the turbine builds what with it being the halfway mark and all that.
O7/09/23 All gear onsite & T1 build started.
14/09/23 T1 up.(7 days)
15/09/23,crane moving to T2.
05/10/23 T2 up. (20 days)
06/10/23 crane moving to T3.
????? Crane breaks @ T3, back up crane brought in.
17/10/23 T7 up. (11 days)
?????? Crane repairs @ T3
25/10/23 T3 up. (8 days).
50 days to get to 1/2 way mark incl a couple of legit named storms and a crane breakdown. That's around 12th Dec projecting out for all 8 to be up. I think that's excellent progress so far. . They'll.be needing zero hoods soon though!
While that's been happening GF has been winding up the generation figures, albeit without the mammoth return of July, but finance wise, sufficient to surpass all the remainder. It's return alone for October showing our energy bill for the month a clean pair of heels.
AD, you did go into KH too?
I'll book out 03.50hrs on 15th Dec for final nosecone going on. Anyone else care to have a crack at scrying?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Yes Joeboy, in for KH and planning to come up for open day. As for final nosecone going on then I'm not sure I'd even get the right month let alone time and date. How about midnight Dec 24th, just in time for Christmas.
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Haha I don’t think anyone is working at 03:50.
Let’s say the topping off ceremony at 9am!
Let’s say the topping off ceremony at 9am!
Re: Part ownership of a Ripple Wind Turbine, fancy it?
The completion list to date is.
03.50hrs 15/12/23 joeboy
09.00hrs 15/12/23 AGT
23.59hrs 24/12/23 AD
Entries are open until next Turbine completion is announced. The prize is a pint on open day. Aye of beer, I can see it already. Pint of 40yr old Macallan.bar steward!
03.50hrs 15/12/23 joeboy
09.00hrs 15/12/23 AGT
23.59hrs 24/12/23 AD
Entries are open until next Turbine completion is announced. The prize is a pint on open day. Aye of beer, I can see it already. Pint of 40yr old Macallan.bar steward!
Last edited by Joeboy on Mon Oct 30, 2023 6:29 am, edited 1 time in total.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
There is a 48hr window forecast for next weekend, with two cranes, maybe they can get two done.
I'd go for 4th Nov for the next one.
But for the 8th (all of them up), 6.00 pm 20th Dec.
I'd go for 4th Nov for the next one.
But for the 8th (all of them up), 6.00 pm 20th Dec.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3