Part ownership of a Ripple Wind Turbine, fancy it?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Thats a new sight on my Ripple dashboard, over 4kW output from my share of GF.
The transfer of a little over 1kW to me from my late father's share of GF came through only yesterday. So the "passing on", of a Ripple project via inheritance thing works ok, just death certificate needed, no need to wait for probate and no admin fee. My brother also joins the GF club too.
If the investment is held for over 2 years its inheritance tax free as it qualifies for business tax relief.
https://www.uk.coop/resources/community ... itance-tax
And he held them for over 2 years.
https://camelot-forum.co.uk/phpBB3/view ... p=902#p902
The transfer of a little over 1kW to me from my late father's share of GF came through only yesterday. So the "passing on", of a Ripple project via inheritance thing works ok, just death certificate needed, no need to wait for probate and no admin fee. My brother also joins the GF club too.
If the investment is held for over 2 years its inheritance tax free as it qualifies for business tax relief.
https://www.uk.coop/resources/community ... itance-tax
And he held them for over 2 years.
https://camelot-forum.co.uk/phpBB3/view ... p=902#p902
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Here's to your Dad Nowty, !nowty wrote: ↑Mon Nov 13, 2023 3:11 pm Thats a new sight on my Ripple dashboard, over 4kW output from my share of GF.
The transfer of a little over 1kW to me from my late father's share of GF came through only yesterday. So the "passing on", of a Ripple project via inheritance thing works ok, just death certificate needed, no need to wait for probate and no admin fee. My brother also joins the GF club too.
If the investment is held for over 2 years its inheritance tax free as it qualifies for business tax relief.
https://www.uk.coop/resources/community ... itance-tax
And he held them for over 2 years.
https://camelot-forum.co.uk/phpBB3/view ... p=902#p902
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
-
- Posts: 2011
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Part ownership of a Ripple Wind Turbine, fancy it?
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Banging out a 98.5% hourly cf.
Great to see.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
-
- Posts: 2011
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Yes, still going... What a day! (Maybe dropping off a bit now though)
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Part ownership of a Ripple Wind Turbine, fancy it?ke t
My brothers well chuffed and he’s only had a share of GF for a couple of days.
I told him not to get used to it being like that everyday but tomorrow looks good too.
I told him not to get used to it being like that everyday but tomorrow looks good too.
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Ripple project 4 is another solar farm/park.
We’re delighted to reveal that our next project will be a solar park.
After the success of Derril Water, the UK's first shared solar park, this next solar park will not only be larger but it's going to be cheaper too.
Reservations for this project will close on 20th November at noon.
We’re delighted to reveal that our next project will be a solar park.
After the success of Derril Water, the UK's first shared solar park, this next solar park will not only be larger but it's going to be cheaper too.
Reservations for this project will close on 20th November at noon.
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: Part ownership of a Ripple Wind Turbine, fancy it?
What’s the typical minimum buy in for the solar projects ?
Is it really £25 or do you have to top up the reservation once the unit cost is determined?
Moxi
Is it really £25 or do you have to top up the reservation once the unit cost is determined?
Moxi
Re: Part ownership of a Ripple Wind Turbine, fancy it?
For all 3 projects to date the minimum has been £25, its specified in the share offer doc.
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3