Octopus saving sessions coming 1st Nov

AE-NMidlands
Posts: 2034
Joined: Wed Jun 02, 2021 6:10 pm

Re: Octopus saving sessions coming 1st Nov

#731

Post by AE-NMidlands »

Yuff wrote: Thu Nov 30, 2023 10:45 am Tomorrow looks particularly challenging according to the octopus email for charging EVs
Are they asking you to hold off if you can?
Being Friday (with presumably lower demand in sight the next day) it would be the ideal time to draw down V2G from those people not planning on going out and recharge them over the weekend. Perhaps a double bonus for exporting at crisis times - but then isn't that what Agile does anyway?
Is a premium being offered?
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Yuff
Posts: 481
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: Octopus saving sessions coming 1st Nov

#732

Post by Yuff »

AE-NMidlands wrote: Thu Nov 30, 2023 11:08 am
Yuff wrote: Thu Nov 30, 2023 10:45 am Tomorrow looks particularly challenging according to the octopus email for charging EVs
Are they asking you to hold off if you can?
Being Friday (with presumably lower demand in sight the next day) it would be the ideal time to draw down V2G from those people not planning on going out and recharge them over the weekend. Perhaps a double bonus for exporting at crisis times - but then isn't that what Agile does anyway?
Is a premium being offered?
its just the weekly email from octopus informing you what days are the greenest to charge your battery.
from 1-100, the higher the better.
Tomorrow is 5
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
dan_b
Posts: 2289
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Octopus saving sessions coming 1st Nov

#733

Post by dan_b »

Can you spot the 3x 30min time blocks when the Energy Saving Session was yesterday on my usage chart?!



Image
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
Stinsy
Posts: 2859
Joined: Wed Jun 02, 2021 1:09 pm

Re: Octopus saving sessions coming 1st Nov

#734

Post by Stinsy »

Here is mine:

Image

Image

Image
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#735

Post by nowty »

Heads up for tomorrow, :twisted:

Its another live one, so expect similar terms to the last one. :mrgreen:

From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Stinsy
Posts: 2859
Joined: Wed Jun 02, 2021 1:09 pm

Re: Octopus saving sessions coming 1st Nov

#736

Post by Stinsy »

nowty wrote: Thu Nov 30, 2023 3:43 pm Heads up for tomorrow, :twisted:

Its another live one, so expect similar terms to the last one. :mrgreen:

From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
I assume they exclude saving sessions in the assessment of your normal usage?
Is it worth trying to get additional IO cheap slots this evening and charging your car?
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#737

Post by nowty »

Stinsy wrote: Thu Nov 30, 2023 4:21 pm
nowty wrote: Thu Nov 30, 2023 3:43 pm Heads up for tomorrow, :twisted:

Its another live one, so expect similar terms to the last one. :mrgreen:

From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
I assume they exclude saving sessions in the assessment of your normal usage?
Is it worth trying to get additional IO cheap slots this evening and charging your car?
Yes and yes.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Octopus saving sessions coming 1st Nov

#738

Post by nowty »

In fact if it turns out to be another £4 / kWh payout its actually worth it paying peak rate. :shock:
Any amount over £3.05 / kWh will work out better if your on IOG at 30.5p peak. :whako:

I'm going to give the SH's a blast between 5pm and 6pm tonight.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Krill
Posts: 387
Joined: Fri Sep 02, 2022 4:38 pm

Re: Octopus saving sessions coming 1st Nov

#739

Post by Krill »

Any idea when Octopus will give the heads up and confirm the payment amount?
Solar PV: 6.4kW solar PV (Eurener MEPV 400W*16)
PV Inverter: Solis 6kW inverter
Batteries: 14.4kWh LiFePO4 batteries (Pylontech US5000*3)
Battery Inverter: LuxPowertek 3600 ACS*2 battery inverter
WBS: 8kW Hunter Avalon 6 Multifuel burner (wood only)
dan_b
Posts: 2289
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Octopus saving sessions coming 1st Nov

#740

Post by dan_b »

So another Octopus Saving Session?
Interesting the time is earlier than on Wednesday - starts at 4.30pm rather than 5.30pm?

nowty wrote: Thu Nov 30, 2023 3:43 pm Heads up for tomorrow, :twisted:

Its another live one, so expect similar terms to the last one. :mrgreen:

From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Post Reply