Yuff wrote: ↑Thu Nov 30, 2023 10:45 am
Tomorrow looks particularly challenging according to the octopus email for charging EVs
Are they asking you to hold off if you can?
Being Friday (with presumably lower demand in sight the next day) it would be the ideal time to draw down V2G from those people not planning on going out and recharge them over the weekend. Perhaps a double bonus for exporting at crisis times - but then isn't that what Agile does anyway?
Is a premium being offered?
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Yuff wrote: ↑Thu Nov 30, 2023 10:45 am
Tomorrow looks particularly challenging according to the octopus email for charging EVs
Are they asking you to hold off if you can?
Being Friday (with presumably lower demand in sight the next day) it would be the ideal time to draw down V2G from those people not planning on going out and recharge them over the weekend. Perhaps a double bonus for exporting at crisis times - but then isn't that what Agile does anyway?
Is a premium being offered?
its just the weekly email from octopus informing you what days are the greenest to charge your battery.
from 1-100, the higher the better.
Tomorrow is 5
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
Its another live one, so expect similar terms to the last one.
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
nowty wrote: ↑Thu Nov 30, 2023 3:43 pm
Heads up for tomorrow,
Its another live one, so expect similar terms to the last one.
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
I assume they exclude saving sessions in the assessment of your normal usage?
Is it worth trying to get additional IO cheap slots this evening and charging your car?
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
nowty wrote: ↑Thu Nov 30, 2023 3:43 pm
Heads up for tomorrow,
Its another live one, so expect similar terms to the last one.
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
I assume they exclude saving sessions in the assessment of your normal usage?
Is it worth trying to get additional IO cheap slots this evening and charging your car?
Yes and yes.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
In fact if it turns out to be another £4 / kWh payout its actually worth it paying peak rate.
Any amount over £3.05 / kWh will work out better if your on IOG at 30.5p peak.
I'm going to give the SH's a blast between 5pm and 6pm tonight.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
So another Octopus Saving Session?
Interesting the time is earlier than on Wednesday - starts at 4.30pm rather than 5.30pm?
nowty wrote: ↑Thu Nov 30, 2023 3:43 pm
Heads up for tomorrow,
Its another live one, so expect similar terms to the last one.
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Friday 01/12/2023 between 16:30 and 18:00. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:00 hours on 30/11/2023. Issued by Gavin Brown National Grid Electricity National Control Centre.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work