HPC

Any news worthy story. Good things to watch at the Cinema, Theatre, on TV or have you read a good book lately?
Post Reply
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#61

Post by dan_b »

The Czech Republic chooses a Korean reactor design for its new nuclear plans, snubbing EDF's EPR

https://www.reuters.com/business/energy ... 024-07-17/
dan_b wrote: Thu May 02, 2024 1:21 pm EDF submits its proposals for 4x EPR1200s for the Czech power sector.
These would be "Version 2s" of the EPR design being built at HPC - lower output but apparently much simpler and cheaper to build.

https://www.edf.fr/en/the-edf-group/ded ... h-republic
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#62

Post by dan_b »

As of this evening EDF has received approval to start the reactor and begin the process of ramping up to generate power and feed into the grid.

That’s the second EPR finally coming into service in Europe.

https://x.com/edfofficiel/status/183067 ... VCC6tlRF_Q
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1329
Joined: Mon Jun 14, 2021 1:17 pm

Re: HPC

#63

Post by Mart »

Looks like they're going to miss the 2013 target date then. :whistle:
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#64

Post by dan_b »

What's an 11-year delay between friends though Mart?!
Mart wrote: Tue Sep 03, 2024 7:31 am Looks like they're going to miss the 2013 target date then. :whistle:
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HPC

#65

Post by dan_b »

Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1329
Joined: Mon Jun 14, 2021 1:17 pm

Re: HPC

#66

Post by Mart »

dan_b wrote: Tue Sep 03, 2024 5:05 pm What's an 11-year delay between friends though Mart?!
Mart wrote: Tue Sep 03, 2024 7:31 am Looks like they're going to miss the 2013 target date then. :whistle:
Gonna be a fun conversation when 'Big Tony' and his boys turn up and ask for the vig! :shock:


PS - What did the FT say, I can't read it?
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
User avatar
nowty
Posts: 5886
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: HPC

#67

Post by nowty »

Mart wrote: Tue Sep 03, 2024 5:18 pm
dan_b wrote: Tue Sep 03, 2024 5:05 pm What's an 11-year delay between friends though Mart?!
Mart wrote: Tue Sep 03, 2024 7:31 am Looks like they're going to miss the 2013 target date then. :whistle:
Gonna be a fun conversation when 'Big Tony' and his boys turn up and ask for the vig! :shock:


PS - What did the FT say, I can't read it?
https://archive.ph/D3xm6
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Moxi
Posts: 2327
Joined: Sun Oct 31, 2021 3:46 pm

Re: HPC

#68

Post by Moxi »

oh dear oh dear, no way of wrapping this one up pretty, although they do try to........

https://www.msn.com/en-gb/news/world/ne ... c516&ei=61

An automatic reactor scram is never good event, if a reactor has to be shut down its preferable for the operators to be aware and conducted their own reactor shut down then at least they can be said to be in control. Automatic shut down suggests the instrumentation had to do the task because the control room did not act quickly enough.

Another calamity along the route for this reactor type.

Moxi
Ken
Posts: 519
Joined: Mon Jul 26, 2021 10:07 am

Re: HPC

#69

Post by Ken »

Thiers cost 13B and ours will cost 40B -you what ?
Mart
Posts: 1329
Joined: Mon Jun 14, 2021 1:17 pm

Re: HPC

#70

Post by Mart »

Ken wrote: Thu Sep 05, 2024 12:19 pm Thiers cost 13B and ours will cost 40B -you what ?
Can't polish the HPC turd, but I'll attempt to roll it in glitter:

HPC was started later so higher cost as nuclear tends to have a negative learning curve*, and HPC is two ~1.6GW reactors, whilst Flamanville is just one.

*I believe it's the only industry in history to have a negative learning curve, mainly because ever more stringent safety levels are required due to the scale of 'disaster' that the edge cases cause.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Post Reply